Laserfiche WebLink
Stantec <br /> Page 2of2 <br /> On a scale of 1 -10, how would you rate the overall performance of your Client Service Manager? <br /> _8_ (A rating of 1 is low 5 is average and 10 is excellent) <br /> BENCHMARK GRADES <br /> Please provide a benchmark score for our performance in the following areas. (A rating of 1 is low, <br /> 5 is average, and 10 is high). Additional comments may be added on reverse if desired). <br /> SCORE SERVICE COMMENTS <br /> City Engineer (development <br /> 8 reviews, council meetings, Normally is well prepared for meetings. <br /> dealings with the public etc.) <br /> Planning- comprehensive plans, <br /> AUAR's, EAW's <br /> General Engineering (feasibility Feasibility reports are timely and contain adequate <br /> 8 reports, plans and detail. <br /> specifications) <br /> Water Storage/Towers <br /> 8 Responsive to Council wishes. Adequate information <br /> Wells /Lift Stations Is provided. <br /> Water Resources, Stormwater Does a good job of managing stormwater design <br /> 8 Review, and Wetland requirements in projects. <br /> Assistance <br /> Traffic/ Transportation <br /> 8 Mapping /GIS Maps are usually up to date and updates are timely. <br /> Could have better managed trail work near wetland. <br /> At the same time, engineer did a good job in working <br /> g Construction Services (Public) with city staff to keep costs down during <br /> construction. <br /> Construction Services (Private) <br /> 8 Billing Billings are timely and contain adequate detail. <br /> 22 <br />