Laserfiche WebLink
Page 2 of 3 <br />Engineering Services <br />Anoka County Highway Department Staff will take the lead on the design, bidding and administration of this <br />project. However, they have requested that the City provide certain elements of the design to be <br />incorporated into their set of bid documents. Those elements proposed to be designed by the City are: <br />• Trunk storm sewer (42"+ dia. pipe from downtown, 30" pipes on east side of CSAH 21) <br />• City utility extensions or relocations <br />• Ditch/Pond evaluation (modeling) <br />• Possible modifications to ditch/pond <br />Our services and proposed fees can be broken down as follows: <br />Proiect Management and Technical Advisory Committee Participation (includes services to -date): <br />• Project management and coordination <br />o Assumes bidding this winter/spring and 2014 construction <br />• Preparation for, and attendance of Technical Advisory Committee (TAC} meetings <br />• Preparation for and attendance of Public Open Houses <br />• Review and submit comments on County design documents <br />• Communication with stakeholders (regulatory agencies, public, etc.) <br />o County will take the lead on the RCWD permit application with Stantec will only provide <br />technical data from modeling and design as needed. The county will be responsible for <br />producing the application, related figures, narratives and the like as well as responding to <br />comments. <br />• Providing county with information on city utilities (record plans, etc.) <br />Design of Sewer and Water Improvements <br />• Produce plans and specs for inclusion in the County's bidding package. <br />• Answer bidder questions <br />Design of Trunk Storm Sewer Improvements <br />• Produce plans and specs for the 42"+ dia. storm sewer along the west side of CSAH 21 for inclusion <br />in the County's bidding package <br />• Provide the County with sizing and invert design information for the 30" dia. pipes on the east side of <br />CSAH 21 <br />• Answer bidder questions <br />Evaluation of Ditch and Pond <br />• Evaluate the existing capacity of the ditch along the south side of LaMotte Park as it relates to <br />handling additional drainage from the project. <br />• Explore conceptual options for lowering ditch system to better drain areas east of CSAH 21 <br />• Evaluate the existing capacity of the Anoka Park Pond as it relates to handling additional drainage <br />from the project. <br />• Explore conceptual options for modifications or expansions of the pond and irrigation system. <br />Design of Ditch or Pond Modifications <br />• Create plan sheets for the modificationof the ditch and/or pond if either of these options is pursued. <br />99 <br />