Laserfiche WebLink
Page 3 of 3 <br />Our proposal does NOT include the following elements, which will be designed by the County: <br />• Grading and erosion control (except for ditch work along the south side of LaMotte Park) <br />Storm sewer laterals <br />• Roadway geometrics, sections, striping, etc. <br />• Trails/Walks <br />Fees <br />The scope of our services and the associated fees, summarized below, are based on the current scope of <br />construction as detailed above. Should the scope of construction project change, our fees would need to be <br />adjusted accordingly. <br />We have listed the design of the ditch and/or pond modifications separately and as an item to be determined. <br />The extent of those modifications could range anywhere from no modifications, to large, complex <br />modifications. Once a design concept is decided upon, we can submit an update to this proposal for that <br />work. <br />Task Fee <br />Project Management/Meetings/Plan Review $16,000 <br />City Utility Design $5,000 <br />Trunk Storm Sewer Design $12,000 <br />Ditch Pond Evaluation/Modeling 110,000 <br />Total $43,000 <br />Design of Ditch/Pond Modifications $TBD <br />This proposal includes services up to and including the project bid date. Services after that date can be <br />detailed in a separate proposal at that time. <br />Sincerely, <br />STANTEC CONSULTING SERVICES, INC. <br />I <br />Mark Statz, PE <br />City Engineer <br />651-604-4709 <br />Cc: Lee Mann, Phil Elkin — Stantec <br />94 <br />