Laserfiche WebLink
City of Centerville <br />Council Meeting Minutes <br />September 11, 2013 <br />Administrator Larson stated that with the proposed budget the tax levy would stay the <br />same as last year and that Council could decrease the proposed levy prior to the final <br />hearing in December, but could not increase it. <br /> <br />Motion by Council Member Paar, seconded by Council Member Fehrenbacher to <br />approve Resolution Number 13-018 adopting the preliminary budget and tax levy. <br />All in favor. Motion passed. <br /> <br />2. Planning & Zoning Commission Recommendation to Approve Variance Request <br /> – 1588 Sorel Street ~ Accessory Structure Placement in Front Yard Due to Rear <br /> Yard Setback from Lake <br /> <br />Administrator Larson reported that the residence orients to the lake with the side and <br />front yards facing Sorel Street, the owners seek approval to construct a small utility shed <br />other than in the rear yard and that the Planning & Zoning Commission had submitted <br />their findings and recommendation for approval. <br /> <br />Council Member Love, Planning & Zoning Commission Liaison, stated that one <br />individual was present for the public hearing and that they were in favor of granting the <br />requested variance. <br /> <br />Motion by Council Member King, seconded by Council Member Love to approve <br />the findings and decision of P & Z, including approval of the Variance Request – <br />1588 Sorel Street ~ Construction of an Accessory Structure. All in favor. Motion <br />passed. <br /> <br />3. CSAH21/Centerville Road Project ~ Consider Construction of Trail/Sidewalk <br /> <br />Administrator Larson reported that subsequent to a recent meeting with representatives <br />from the Anoka County Highway Department, cost estimates that have been provided by <br />the County are not completely clear as to the cost differential between installation of a <br />sidewalk or 8’ wide pedestrian/bicycle trail from Meadow Lane to Dupre Road and <br />clarification was needed. Administrator Larson also reported that Anoka County is not <br />assuming any costs associated with the storm sewer pipe on the east side of the road. <br />Engineer Statz and others believe that the County too would benefit from the storm sewer <br />system installation on the east side of the roadway due to drainage, ponding requirements <br />and the necessity of alleviating the ditch for safety. Early estimates suggest that costs for <br />sidewalk would be approximately $142,000 and an 8’ wide pedestrian/bike trail would be <br />approximately $178,000. It was felt that if the County chose not to absorb any portion of <br />the installation of storm sewer system they would need to secure property for ponding, <br />which would entail appraisals and purchase prices of fair market value. Both <br />Administrator Larson and Engineer Statz felt that this item could be negotiated further <br />and that additional information/clarification was needed regarding the sidewalk/trail <br />costs. Administrator Larson stated that at this time, the County is attempting to secure <br />Centerville’s decision whether to install a sidewalk/pedestrian/bicycle trail or not. <br />Discussion ensued regarding the proposed 4’ width of the shoulder, the proposed 3’ <br />Page 3 of 4 <br /> <br />