Laserfiche WebLink
DRAINAGE <br /> The City is including in the project the construction of a trunk storm sewer from downtown, south along <br /> CSAH 21 to the existing ditch 300 feet south of Center Street, that is planned to accommodate future <br /> redevelopment. The City shall supply the signed plan sheets and specifications for the proposed storm <br /> sewer. The total cost of the design will be at the expense of the City. All construction documents must <br /> be submitted to the County by March 14, 2014. The County will also utilize this storm sewer for the <br /> drainage from the County Road. The County shall pay for that portion of the storm sewer trunk line <br /> required for the drainage of the County Road. <br /> It is agreed by both parties that the discharge from CSAH 21 to the City trunk storm sewer shall be <br /> treated in the City pond in the County park. Any improvements to the ditch from CSAH 21 shall be cost <br /> shared at 90% City, 10% County (the approx. drainage outletting to this ditch). <br /> If there is storm sewer required that is not able to utilize the City trunk storm sewer, the City shall pay <br /> for a percentage of the cost of the storm sewer system, including the detention basins and their outlet <br /> structures. The City portion of the cost is based on contributing flow through the storm sewer system to <br /> the detention basin determined by the product of contributing area and runoff coefficient. <br /> BITUMINOUS TRAIL: <br /> The City is including a bituminous trail along the east side of CSAH 21. This new trail will extend from <br /> Dupre Road to the existing sidewalk at Meadow Lane. This trail location has been agreed to by the <br /> City. If this location changes in the future, the additional costs associated with this change will be the <br /> responsibility of the City. The existing concrete sidewalk requiring reconstruction between Meadow <br /> Lane and Heritage Street will be paid for by the County, per County Cost Share Agreement. <br /> The parties understand that the cost for the trail includes: bituminous surfacing, aggregate base, <br /> excavation (including muck excavation), borrow material (granular and topsoil), and turf establishment. <br /> The parties agree that the County will pay for the design of the trail, wetland mitigation required by <br /> impacts caused by the trail, the additional right of way and easements required to construct the trail at <br /> the proper location, and any removal items, with the exception of any soils correction in areas of existing <br /> trails, required to construct the trail. <br /> The City shall be responsible for determining the impacts to the drainage system from filling in the <br /> existing ditch along the east side of CSAH 21, and determine the proposed pipe size needed to <br /> accommodate this flow. <br /> TRAFFIC CONTROL <br /> The parties understand and agree that CSAH 2 1 (Centerville Road) will be constructed in the following <br /> stages (preliminary, to be finalized with further discussions with the City and will be dependent on the <br /> bid letting date and how much time is left in the 2014 construction season): <br /> -Stage 1: Road closed from CSAH 34 (Birch St) to Hunter's Trail for construction. <br /> -Stage 2: Road closed from Hunter's Trail to Heritage Street for reconstruction. <br /> 3 <br /> 24 <br />