My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res. #14-006 - Receiving Report & Calling for Public Hearing on Improvement
Centerville
>
City Council
>
Resolutions
>
2000-2023
>
2014
>
Res. #14-006 - Receiving Report & Calling for Public Hearing on Improvement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2014 3:09:57 PM
Creation date
2/20/2014 12:05:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: <br />2014 THIN BITUMINOUS OVERLAY PROJECT (LABOR BID) <br />Stantec Project Number: <br />193801941 <br />Date: <br />2/12/2014 <br />Owner: <br />City of Centerville <br />Opinion of Probable Cost <br />BID TABULATION <br />Item <br />NumItemUnitsQtyUnit PriceTotal <br />PART 1: 2014 THIN BITUMINOUS OVERLAY (LABOR) <br />1MOBILIZATIONLS1$4,999.00$4,999.00 <br />2TRAFFIC CONTROLLS1$1,393.20$1,393.20 <br />3EDGE MILL BITUMINOUS 6' WIDELF19525$1.17$22,844.25 <br />4MILL BITUMINOUS CONSTRUCTION JOINTLF390$7.00$2,730.00 <br />5SAW CUT BITUMINOUSLF4240$1.65$6,996.00 <br />6INSTALL TACK COATGAL1820$4.00$7,280.00 <br />7REMOVE BITUMINOUS PAVEMENT (FULL DEPTH)SY3350$3.44$11,524.00 <br />8INSTALL NON-WEAR COURSE - SPNWB330ETON1600$63.25$101,200.00 <br />9INSTALL 1.0" WEAR COURSE OVERLAY - SPWEA340ETON2413$63.10$152,260.30 <br />10STREET SWEEPER (PICKUP BROOM W/OPERATOR)HR26$119.83$3,115.58 <br />TOTAL PART 1: 2014 THIN BITUMINOUS OVERLAY (LABOR)$314,342.33 <br />ALTERNATIVE 1: WEST LEG OF LAKELAND CIRCLE (LABOR) <br />11TRAFFIC CONTROLLS1$1.03$1.03 <br />12EDGE MILL BITUMINOUS 6' WIDELF1718$1.25$2,147.50 <br />13MILL BITUMINOUS CONSTRUCTION JOINTLF60$20.00$1,200.00 <br />14INSTALL TACK COAT GAL163$4.00$652.00 <br />15INSTALL 1.0" WEARING COURSE OVERLAY - SPWEA340ETON212$63.10$13,377.20 <br />16STREET SWEEPER (PICKUP BROOM W/OPERATOR)HR2$119.83$239.66 <br />TOTAL ALTERNATIVE 1: WEST LEG OF LAKELAND CIRCLE (LABOR)$17,617.39 <br />ALTERNATIVE 2: STEVEN LANE (LABOR) <br />17TRAFFIC CONTROLLS1$1.03$1.03 <br />18EDGE MILL BITUMINOUS 6' WIDELF824$1.81$1,491.44 <br />19MILL BITUMINOUS CONSTRUCTION JOINTLF60$20.00$1,200.00 <br />20INSTALL TACK COAT GAL78$4.00$312.00 <br />21INSTALL 1.0" WEARING COURSE OVERLAY - SPWEA340ETON102$63.10$6,436.20 <br />22STREET SWEEPER (PICKUP BROOM W/OPERATOR)HR1$119.83$119.83 <br />TOTAL ALTERNATIVE 2: STEVEN LANE (LABOR)$9,560.50 <br />ALTERNATIVE 3: BRIAN COURT (LABOR) <br />23TRAFFIC CONTROLLS1$1.03$1.03 <br />24EDGE MILL BITUMINOUS 6' WIDELF591$2.38$1,406.58 <br />25MILL BITUMINOUS CONSTRUCTION JOINTLF30$20.00$600.00 <br />26INSTALL TACK COAT GAL56$4.00$224.00 <br />27INSTALL 1.0" WEARING COURSE OVERLAY - SPWEA340ETON73$67.03$4,893.19 <br />28STREET SWEEPER (PICKUP BROOM W/OPERATOR)HR1$119.83$119.83 <br />TOTAL ALTERNATIVE 3: BRIAN COURT (LABOR)$7,244.63 <br />BASE BID: <br />TOTAL PART 1: 2014 THIN BITUMINOUS OVERLAY (LABOR)$314,342.33 <br />TOTAL BASE BID$314,342.33 <br />ALTERNATE BID: <br />TOTAL ALTERNATIVE 1: WEST LEG OF LAKELAND CIRCLE (LABOR)$17,617.39 <br />TOTAL ALTERNATIVE 2: STEVEN LANE (LABOR)$9,560.50 <br />TOTAL ALTERNATIVE 3: BRIAN COURT (LABOR)$7,244.63 <br />TOTAL ALTERNATE BID:$34,422.52 <br />Total Base Bid <br />$314,342.33 <br />Total Alternatives <br />$34,422.52 <br />Total Soft Costs <br />$68,000.00 <br />Proectosts <br />Tota <br />lj C <br />$416,764.85 <br />BT-1 <br />193801941 Feasibility Cost Estimate.xlsm <br />
The URL can be used to link to this page
Your browser does not support the video tag.