Laserfiche WebLink
February 12, 2014 <br />Dallas Larson <br />Page 2 of 2 <br />Reference: 2014 Thin Bituminous Overlay Project – Feasibility Report <br />A detailed cost estimate for these improvements is attached to this report and is summarized below: <br />Base Bid Improvements $313,510 <br />Alternate Improvements $34,590 <br />Soft Costs $68,000 <br />Total Project Costs $416,000 <br />If it is the goal of the City Council to prudently maintain their bituminous streets in a manner which <br />maximizes the life of the pavements at minimum life-cycle costs, then the above improvements are <br />necessary, cost effective and feasible. <br />Regards, <br />Stantec Consulting Services, Inc. <br />Mark Statz, PE <br />City Engineer <br />Phone: 6 1-604-4709 <br />mark.statz@stantec.com <br />Attachment: Project Cost Estimate <br />c. Brian Hare, Lee Mann – Stantec <br />Paul Palzer – Public Works Director <br />sm document2 <br /> <br />