My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-26 CC Set Agenda w/Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2014
>
2014-02-26 CC Set Agenda w/Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2014 3:02:23 PM
Creation date
2/26/2014 4:19:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® Sta n WC Project Name: 2014 ROYAL MEADOWS WATER MAIN IMPROVEME WS (MATERIALS) 1 hereby certify that n,n a an exact <br /> reproduction of bids received. <br /> City Project No.' Stantec Project: 193802483 <br /> 7a4 ` 6 <br /> Brd Opening; Monday, February 10, 2014, at 12 P.M,. CST Owner. S!tof Centerville, MN <br /> Mark R Sto <br /> License No. 42717 <br /> Bidder No. 1 Bidder No. 2 Bidder No, 3 <br /> BID TABULATION Ferguson Water Works Minnesota Pipe & Equipment HD Supply Waterworks. LTD <br /> kern <br /> Nvm BASE BID Item Unft Qty Unit Price Total Unit Price Total Una Price Total <br /> 1 FURNISH 6" GATE VALVE AND BOX EA 4 $1,18100 $4,724.DD $1,330.00 <br /> 2 FURNISH 6" HDPE WATER MAIN LF 1796 $4.90 55,320.00 $1,050 $4.391.00 <br /> 3 FURNISH TRACER WIRE LF 4926 $0.31 $8,800-00 $4.50 58,082.00 $ $55 53 $9.931.88 <br /> 3 .00 $1.527.06 $0.15 1738,90 $060 $2.955.60 <br /> 4 FURNISH HYDRANT WITH VALVE EA 4 $3.659.00 <br /> 5 FURNISH DUCTILE IRON FITTINGS LB 700 $3.40 114.636.00 x,1 116,60000 $3,616.30 $ <br /> $2.380.00 $ $3.00 $2, i 00.00 $3.83 $2.681.20 <br /> $2,681.00 <br /> 6 FURNISH 1" CORPORATION STOP WITH 6' SADDLE EA 36 $156.00 $5,616.00 $112.00 $402.00 $175.00 $6,300.00 <br /> 7 FURNISH 1" HDPE WATER SERVICE PIPE LF 2880 $040 $1,152.00 $0.40 $',152.00 $0.30 $864,00 <br /> 8 FURNISH )'CURB STOP AND BOX EA 36 $16900 $6 084.00 $195.00 .00 $231.80 $8.3 4480 <br /> TOTAL BASE BBD. $44,919.46 $48,044.90 $49,936.46 <br /> Ccnlraclor Name and Address: Ferguson Enterprises. Inc Minnesota Pipe d Equipment HD Supply Waterworks, Ltd_ <br /> 169191sl Avenue NE 5145 21' Ih Sreet W., PO Sou 249 16195 54th Street <br /> \ Blaine. MN 55449 Forniington, MN 55024 St. Michael, MN 55376 <br /> Phone: 763-560-5200 651- 463.6090 763 - 428 -7473 <br /> Fc3c 763.560 -1799 651 - 4634554 7634287559 <br /> Signed 8y. Christopher Schmid Wade Boumberger Tom Gannon <br /> Title: General Manager President Branch Manager <br /> Bid Security: Bid Bond Bid Bond Bid 3ond <br /> Addenda Acknowledged. 1, 2. 3 1. 2, 3 1, 2. 3 <br /> 193NR993Br- MRTER1AU.AW 017-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.