My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-01 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2014
>
2014-04-01 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2014 7:22:33 AM
Creation date
3/27/2014 2:51:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The cost estimate for completion of this trail is $1,973,400. The cost breakdown is shown <br />in Table 2. <br />T2 <br />ABLE <br />Proposed Chain of Lakes-Bald Eagle Regional Trail <br />Development Cost Estimate <br />Description Total <br />Right of Way/Easement Acquisition $294,000 <br />Design/Engineering/Project $100,000 <br />Management <br />Archaeological Survey $50,000 <br />Wetland Delineation $50,000 <br />Topographic Survey/Construction $100,000 <br />Staking <br /> <br />Geotechnical Survey$50,000 <br />Clearing and grubbing $100,000 <br />Utility relocations, if required$100,000 <br />Bituminous trail construction ($40/LF)$635,000 <br />Trailhead Facility Development $100,000 <br />Lighting $75,000 <br />Landscaping and restoration $75,000 <br />Signage and striping $40,000 <br />Site Furnishings $25,000 <br />Sub-Total $1,794,000 <br />Contingency (10%) $179,400 <br />Total $1,973,400 <br /> <br />11 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.