My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-01 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2014
>
2014-04-01 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2014 7:22:33 AM
Creation date
3/27/2014 2:51:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Lake Road, as illustrated in Figure 7. <br />The trail corridor currently follows CSAH 21/Centerville Road and the development <br />concept for this trail is similar to Figure 8, which illustrates the roadway, a grade <br />separation and then the paved trail and Figure 10 illustrates what the completed project <br />could look like. <br />F8 <br />IGURE <br /> <br /> <br />Trailhead signs, as illustrated in Figure 9, are proposed at a <br />few of the major intersections along the trail. The County will <br />work closely with the City of Lino Lakes to incorporate a <br />trailhead at their proposed future recreation facility, which is <br />approximate at the mid-point of the trail. Way-finding <br />directional signs will be posted along the trail as well. No <br />other development will be associated with this trail project. <br />F9 <br /> <br />IGURE <br /> <br /> <br />10 <br /> <br /> <br />F10 <br />IGURE <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.