My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-01-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2015 3:12:46 PM
Creation date
1/23/2015 3:11:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Dispose of contaminated material at appropriate facility. <br /> 4. Documentation <br /> a. Report spills to Emergency 911 <br /> WATER — Planned Waterline Excavation Repair/Replacement <br /> 1. Preparation <br /> a. Determine discharge direction. <br /> b. Protect storm drain inlet. <br /> c. Clean gutters leading to inlet. <br /> 2. Process <br /> a. Direct any discharge to pre-determined area backfill excavation. <br /> b. Haul of excavated material or stock pile nearby. <br /> 3. Clean up <br /> a. Clean gutter where water flowed. <br /> b. Clean up all areas around excavation. <br /> c. Clean up travel path of truck material. <br /> 4. Documentation <br /> a. Record location and date on maintenance log. <br /> WATER — Unplanned Waterline Excavation Repair/Replacement <br /> 1. Preparation <br /> a. Locate valves and shut off water. <br /> b. Protect storm drain inlets. <br /> c. Use proper safety procedures. <br /> 2. Process <br /> a. Follow planned repair procedures. <br /> b. Haul off spoils of excavation. <br /> 3. Clean-up <br /> a. Clean gutter where water flowed. <br /> b. Clean up all areas around excavation. <br /> c. Clean up travel path of truck material. <br /> 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.