My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-05 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2015
>
2015-05-05 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2015 2:26:05 PM
Creation date
5/1/2015 2:25:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendices <br /> Appendix A - Wastewater <br /> The actual inflow/infiltration goal will vary over time based on the average base flow for the <br /> community, which also changes over time. <br /> Table A-1: MCES Flow Variation Factors for Sewer Design <br /> Average Flow Peak Hourly Average Flow Peak Hourly <br /> (MGD) Flow Factor (MGD) Flow Factor <br /> 0.00-0.11 4.0 1.90 -2.29 2.8 <br /> 3.9 2.30 -2.89 2.7 <br /> 3.8 2.90 -2.49 2.6 <br /> 0.2d-0.2 9 g 3.7 3.50--4.19 2.5 <br /> 4.8$ � 3.6 4.20-5.09 2.4 <br /> 0.40-0.49 ~ 3.5 5.10 -6.39 2.3 <br /> 0.50-0.64 3.4 6.40 7.9-9 2.2 <br /> 0.65-0.79 __..- 3.3 8,00- 10.39 2.1 <br /> 0.80-0.99 3.2 10.4- 13.49 2.0 <br /> 1.00"'1.19. 3.1 13.5 - 17.99 1.9 <br /> 1.i0-1.49 3.0 180- 29.99 1.8 <br /> 1.50-1.89 2.9 over 30.00 1.7 <br /> 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.