Laserfiche WebLink
ITEM 18.WATER QUALITY:WASTEWATER <br /> Item No. Mitigation Description Update <br /> 18.1 Monitor wastewater flows and not permit new development to proceed if it exceeds This mitigation measure is ongoing <br /> the capacity of the wastewater system. <br /> 18.2 Construct the major infrastructure improvements needed to expand the capacity of This mitigation measure is ongoing <br /> the wastewater system(i.e.lift stations,forcemains,and upgrades to the existing <br /> systems)in accordance with the Comprehensive Sanitary Sewer Plan and Capital <br /> Improvement Plan. <br /> 18.3 Adequately phase capacity improvements. This mitigation measure is ongoing <br /> 4 Amend the Comprehensive Sanitary Sewer Plan and Capital Improvement Plan to This mitigation measure is ongoing.No updates <br /> be consistent with any amendments to the Comprehensive Plan that would have been needed to date for the study area <br /> necessitate expansions or alterations to the sanitary sewer system and regional <br /> capacity needs. <br /> 18.5 Added Each proposed development will be required to provide a detailed projection of Measure was included in original AUAR <br /> wastewater generation and flows. These calculations will be checked by the City's within the text. <br /> Engineering Consultant. <br /> 18.6 Added The City will create a year-end report to evaluate wastewater increases by major Measure was included in original AUAR <br /> sewer lines and overall system usage in relation to capacity.Results of this within the text. <br /> assessment will become the targets for growth for the following year. <br /> 11 Mitigation Plan Update -2015 June 3,2015 <br /> 71 <br />