My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-22 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-07-22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 3:19:40 PM
Creation date
7/17/2015 3:18:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM 19.SOIL AND GROUNDWATER CONTAMINATION <br /> Item No. Mitigation Description Update <br /> 19.1 Require the removal of all tanks and associated underground piping in accordance This mitigation measure is ongoing <br /> with applicable state and federal laws. <br /> 19.2 Require that any party that may discover residual petroleum contamination shall This mitigation measure is ongoing <br /> follow state law and report the information to the MPGA for further investigation <br /> and potential remediation. <br /> ITEM 21.TRANSPORTATION <br /> Item No. Mitigation Description Update <br /> 21.1 Create a monitoring program that closely evaluates traffic impacts from proposed Traffic Impact Studies are required for <br /> developments within the AUAR area. proposed developments showing the impact on <br /> the transportation system and consistency with <br /> the AUAR. <br /> 21.2 Implement traffic mitigation measures as development occurs within the AUAR CSAH 14 improvement was completed in 2009 <br /> area. Specific mitigation measures for the three development scenarios are and noted in the 2010 AUAR Update <br /> discussed in Item 21 and depicted on Figures 21-8,21-9,and 21-10. These <br /> mitigation measures improve overall traffic operations for the respective CSAH 54(formerly CSAH 21)20`h Avenue <br /> development scenarios. The improvements are intended to represent the minimum North intersection improvements were <br /> level of infrastructure investment that would be needed to meet acceptable level of completed and noted in the 2010 AUAR <br /> service standards. Additional roadway and non-motorized improvements,beyond Update. <br /> the minimum level,may be identified to accommodate specific development needs <br /> that are identified within the AUAR area."Primary improvements,regardless of 1-35E Interchange reconstruction was <br /> land use scenario,include: completed in 2011. This mitigation measure is <br /> 21.2.1 Develop frontage road system in compliance with local,county and complete. <br /> state access management guidelines to serve local and regional traffic. <br /> 12 Mitigation Plan Update -2015 June 3,2015 <br /> 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.