My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-26 Handouts @ Worksession
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-08-26 Handouts @ Worksession
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2015 1:38:44 PM
Creation date
9/8/2015 1:38:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2016 Proposed Budget <br /> Key Factors to Consider <br /> Road Improvement Levy: <br /> ■ Typically $200,000 per year to meet annual needs; <br /> ■ Currently at $160,000, supplemented by $40,000 in MSA; <br /> ■ An increase of $40,000 in levy results in additional 1.6% <br /> levy increase for a total of 7% increase. <br /> Franchise Fees: <br /> ■ A fee on gas and electric bills; <br /> ■ Could result in $125,000 - $150,000 in revenue; <br /> ■ Maximum of $4 on each service = $8/month household. <br /> Storm Water Fees: <br /> ■ Storm Water Fund Balance $127,000; <br /> ■ Residential fee currently $55.80/year; <br /> ■ Funds adequate for one pond. <br /> Water and Sewer Fees: <br /> ■ Raised 5% in 2015; <br /> ■ Operating loss, but overall gains posted; <br /> ■ Fund Balance Water Fund $1.1M; <br /> ■ Fund Balance Water Fund $1.1M; <br /> ■ Due from other Funds $1.3M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.