My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-23 CC Agenda w-Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-09-23 CC Agenda w-Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2015 6:14:50 PM
Creation date
9/23/2015 6:14:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br /> Stantec <br /> September 17,2015 <br /> File:198803123 <br /> Attention: Mike Ericson <br /> 1880 Main Street <br /> Centerville,MN 55038 <br /> Dear Mike, <br /> Reference:Annual Thin Bituminous Overlay Program <br /> 2016 Thin Bituminous Overlay Project <br /> At your request we have prepared the following scope of services and fee proposal for engineering services <br /> related to the 2016 Thin Bituminous Overlay project. Those services include: <br /> Feasibility Report <br /> A portion of the costs of the past two projects have been specially assessed. This requires a feasibility <br /> report under MN Chapter 429 law. We will complete the feasibility study, prepare for and attend both the <br /> Public Improvement Hearing and Assessment Hearing. Our proposal anticipates these hearings to be <br /> conducted on the same night as regularly scheduled City Council Meetings. We also assume that the City <br /> Clerk will prepare the preliminary and final assessment rolls for the project as she has for past projects. <br /> The other element included in the Feasibility Report stage is the evaluation of streets scheduled for overlay. <br /> This involves a tour, with the Public Works Director, of the streets scheduled for overlay as well as others <br /> which may not have been on the schedule, but which the Public Works Director feels should be examined <br /> for possible inclusion in the project. This work is necessary to give the Council an informed opinion on the <br /> appropriateness of an overlay for the programmed streets. <br /> Plans and Specifications <br /> In 2014, we developed a set of programmatic plans and specifications for the Thin Bituminous Overlay <br /> program which we continue to use for each project. Minor modifications to these specifications are made <br /> each year to adapt to new MNDOT bituminous specifications, or to refine our approach to the program <br /> based on our experiences with last year's project. Plans are, of course, updated to show this year's streets <br /> and reviewed for any changes to the standard details that may be appropriate. <br /> Assistance with Bidding <br /> As part of this phase, we will publish an advertisement for bids(ad costs paid by city) as required by public <br /> bidding law,answer bidder questions, produce and distribute Addenda, attend the Bid Opening,and <br /> produce and review a Bid Tabulation. Once bids are received and presented to the City Council for award, <br /> contracts will be prepared and distributed for execution. <br /> Design with community in mind <br />
The URL can be used to link to this page
Your browser does not support the video tag.