Laserfiche WebLink
BOUNDARIES • • COSTS <br /> City of Lino Lakes and Laurie LaMotte Memorial Park in the City of Centerville. <br /> The trail is proposed to be an eight to ten foot wide paved trail. Working west to east,as shown in Figure 3, <br /> Exhibit A, the existing trail leaves Bunker Hills Regional Park from the south east corner of the park,just <br /> north of Blaine High School. It crosses to the south side of Bengal Drive and heads east as an eight foot wide <br /> striped on-road bicycle lane. At Jefferson Street the trail changes to a ten foot wide grade separated paved <br /> trail behind the curb and travels south on the west side of the street. At the intersection of Jefferson Street <br /> and CSAH 14/Main Street,the trail crosses at the signalized intersection to the south side of CSAH 14/Main <br /> Street and travels east, crossing over Highway 65 and currently ending at Aberdeen Street. From Aberdeen <br /> Street,the proposed trail is to be a ten foot wide grade separated paved trail that follows on the south side <br /> of CSAH 14/Main Street to Cloud Drive. This stretch is just over a mile long and would potentially impact 22 <br /> i <br /> 14 <br /> Legend p4 <br /> EXISTING BUNKER-CHAIN OF i <br /> LAKES REGIONALTRAIL <br /> • .PROPOSED BUNKER-CHAIN OF <br /> LADS REGIONALTRAIL <br /> 16 SCHOOL <br /> ASSISTED UvING FACILITY <br /> 0 UBRARY <br /> EXISTING REGIONALTRAIL <br /> 5 <br /> -•PROPOSED REGIONAL TRAIL <br /> --- ROADWkY <br /> EXISTING CITY TRAIL <br /> PROPOSED CRY TRAIL <br /> aTY PARK ` <br /> i <br /> -TTRRA�PARK -- <br /> I <br /> LA VATER <br /> Bunker- Chain of Lakes Regional Trail Alignment <br /> Figure 3 Exhibit A <br /> parcels. If right of way or easements are needed,it is estimated that the width of those easements may be <br /> between 15 and 20 feet. It is anticipated that the trail along this stretch will be completed within the next <br /> 5-7 years. <br /> Page 3 <br /> 5 <br />