My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-10-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2015 2:51:29 PM
Creation date
10/9/2015 2:44:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOUNDARIES • • COSTS <br /> At Cloud Drive, as shown in Figure 4, Exhibit B, the trail travels south on the west side of the road to <br /> approximately West Lake Boulevard. Near that intersection,the trail then travels east,through The Lakes <br /> residential development and along the man-made lake with connections to Lakeside Commons and East Lake <br /> 14 <br /> 111 1 <br /> Legend 7 7 <br /> EXISTING BUNKER-CHAIN OF <br /> LAKES REGIONAL TRAIL <br /> PROPOSED BUNKER-CHAIN <br /> ... <br /> OF LAKES REGIONALTRAIL - <br /> EXISTINGREGIONALTRAIL <br /> --PROPOSED REGIONALTRAIL `*� <br /> 116 SCHOOL <br /> ASSISTED LIVING FACILITY <br /> ROADWAY <br /> EXISTING CITY TRAIL <br /> PROPOSED CITY TRAIL - - - - <br /> CITY PARK <br /> -REGIONALPARK REGIONAL <br /> TRAILCORRIDOR _ <br /> WATER <br /> Bunker- Chain of Lakes Regional Trail Alignment <br /> Figure 4 Exhibit B <br /> Parks. The trail is existing and complete through this section of Cloud Drive and East Lake Park. Just east of <br /> East Lake Park,the ten foot wide paved trail is proposed to travel east through a future development to CSAH <br /> 17/Lexington Avenue. The County will work closely with the City of Blaine to ensure that trail easements <br /> are acquired and the trail is constructed as development occurs. <br /> At CSAH 17, the trail alignment connects to an existing ten foot wide portion of the East Anoka County <br /> Regional Trail and travels south on the west side of the road to 109th Avenue. At the signalized intersection <br /> at 109th and Lexington Avenues,the trail follows on the south side of 109th to Pheasant Ridge Drive where it <br /> currently ends. From there,as shown in Figure 5,Exhibit C,the 10 foot wide paved trail is proposed to follow <br /> on the south side of 109th from Pheasant Ridge Drive east to County Road 53/Sunset Avenue. <br /> At County Road 53/Sunset Avenue,the Anoka County Highway Department is currently working with the <br /> Cities of Blaine and Lino Lakes on a roundabout project at 1091h Avenue and Apollo Drive. This project will <br /> Page 4 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.