My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-04 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2015
>
2015-11-04 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 1:12:21 PM
Creation date
10/30/2015 1:11:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEVELOPMENT CONCEPT <br /> In addition,soil borings may be taken to ensure proper construction in areas where soils are questionable. <br /> Since this trail alignment is proposed to traverse open green space areas,wildlife friendly erosion control <br /> materials and native seeding will be incorporated into the trail design. <br /> Table 1 <br /> PROPOSED BUNKER-CHAIN OF LAKES REGIONAL TRAIL The development cost estimate for <br /> DEVELOPMENT COST ESTIMATE completion of this trail is$6,066,500. <br /> Description Total The cost breakdown is shown in Table <br /> Design/Engineering/Project Management $540,000 1.There may be some cost savings on <br /> Archaeological Survey $100,000 this estimate if this trail can be <br /> Wetland Delineation $150,000 constructed as part of a future County <br /> Topographic Survey/Construction Staking $300,000 roadway reconstruction project or if <br /> Geotechnical Survey $150,000 trail corridors can be dedicated as <br /> Clearing and grubbing $200,000 part of future development. <br /> utility relocations,if required $200,000 The schedule for construction of this <br /> Bituminous trail construction $1,600,000 trail will depend on right of way <br /> Pedestrian Bridge Construction $2,000,000 acquisition, roadway reconstruction, <br /> Lighting $50,000 future development along the trail <br /> Landscaping and restoration $150,000 corridor and funding availability. The <br /> Signage and striping $50,000 Parks and Recreation Department <br /> Site Furnishings $25,000 will continue to work with local cities <br /> Sub Total $5,515,000 and the Anoka County Highway <br /> Contingency(10%) $551,500 Department to implement the <br /> construction of this trail as <br /> Total $6,066,500 <br /> opportunities occur. As previously <br /> mentioned in this report,a few small portions of the trail are anticipated to be completed within the next 10 <br /> years. The remaining segments are anticipated to be completed within the next 15-20 years. <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.