My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res. #15-035 - Receiving Report, Calling for P.H. on Imp.
Centerville
>
City Council
>
Resolutions
>
2000-2023
>
2015
>
Res. #15-035 - Receiving Report, Calling for P.H. on Imp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 9:10:45 AM
Creation date
11/10/2015 8:15:44 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2016 THIN OVERLAY PROGRAM <br /> Project Costs <br /> CONSTRUCTION COSTS <br /> The cost estimate includes items discussed in the Proposed Improvements section of this report and <br /> is based on the Project Limits shown in the appendices as Figure 1 and the Milling Profile shown on <br /> Figure 2. This cost estimate is based on bid prices from the last two years' actual bid costs. <br /> Other construction costs outside the main project bid include materials and labor costs for <br /> improvements the public works department may make to the roads ahead of the project, such as <br /> minor curb replacements, bituminous patching, catch basin repair or storm sewer crossing repairs. <br /> SOFT COSTS <br /> In addition to construction costs,other costs which affect the overall project costs include <br /> engineering feasibility, design and construction administration costs. These costs are included in the <br /> total project costs presented below. <br /> PROJECT COSTS <br /> Total project costs are the total of both construction and soft costs and are summarized below: <br /> Estimated <br /> Location Approximate Project Costs Estimated Total <br /> Length [LF] Per Lineal Project Costs <br /> Foot <br /> 2"Overlays <br /> Mill Road 2600 $47 $122,200 <br /> 1"Overlays <br /> Meadow Court 550* $35 $19,250 <br /> Meadow Circle 900* $35 $31,500 <br /> Cottonwood Court 1000* $35 $35,000 <br /> Deer Court 500* $35 $17,500 <br /> Hunter's Trail 1150 $35 $40,250 <br /> Robin Lane Area 2020 $35 $70,700 <br /> Trail Overlays <br /> Trail -Meadow Ct.to Dupre Rd. 1200 $11 $13,200 <br /> Estimated Total Project Cost $349,600 <br /> *Length includes equivalent footages to account for cul-de-sacs <br /> City of Centerville Page 4 <br /> 2016 Thin Overlay Program ® Stantec 193803352 <br />
The URL can be used to link to this page
Your browser does not support the video tag.