My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res. #15-036 - Approving Plans & Specs. & Ordering Ad. For Bids
Centerville
>
City Council
>
Resolutions
>
2000-2023
>
2015
>
Res. #15-036 - Approving Plans & Specs. & Ordering Ad. For Bids
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 9:10:24 AM
Creation date
11/10/2015 9:47:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Contract Documents—Those items so designated in the Agreement. Only printed or hard <br /> copies of the items listed in the Agreement are Contract Documents. Approved Shop <br /> Drawings, other Contractor submittals, and the reports and drawings of subsurface and <br /> physical conditions are not Contract Documents. <br /> 13. Contract Price—The moneys payable by Owner to Contractor for completion of the Work <br /> in accordance with the Contract Documents as stated in the Agreement (subject to the <br /> provisions of Paragraph 11.03 in the case of Unit Price Work). <br /> 14. Contract Times—The number of days or the dates stated in the Agreement to: (i) achieve <br /> Milestones, if any; (ii) achieve Substantial Completion; and (iii) complete the Work so that <br /> it is ready for final payment as evidenced by Engineer's written recommendation of final <br /> payment. <br /> 15. Contractor—The individual or entity with whom Owner has entered into the Agreement. <br /> 16. Cost of the Work—See Paragraph 11.01 for definition. <br /> 17. Drawings—That part of the Contract Documents prepared or approved by Engineer which <br /> graphically shows the scope, extent, and character of the Work to be performed by <br /> Contractor. Shop Drawings and other Contractor submittals are not Drawings as so <br /> defined. <br /> 18. Effective Date of the Agreement—The date indicated in the Agreement on which it becomes <br /> effective, but if no such date is indicated, it means the date on which the Agreement is <br /> signed and delivered by the last of the two parties to sign and deliver. <br /> 19. Engineer—The individual or entity named as such in the Agreement. <br /> 20.Field Order—A written order issued by Engineer which requires minor changes in the Work <br /> but which does not involve a change in the Contract Price or the Contract Times. <br /> 21. General Requirements—Sections of Division 1 of the Specifications. <br /> 22. Hazardous Environmental Condition—The presence at the Site of Asbestos, PCBs, <br /> Petroleum, Hazardous Waste, or Radioactive Material in such quantities or circumstances <br /> that may present a substantial danger to persons or property exposed thereto. <br /> 23.Hazardous Waste—The term Hazardous Waste shall have the meaning provided in Section <br /> 1004 of the Solid Waste Disposal Act (42 USC Section 6903) as amended from time to <br /> time. <br /> 24.Laws and Regulations; Laws or Regulations—Any and all applicable laws, rules, <br /> regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, <br /> authorities, and courts having jurisdiction. <br /> EJCDC C-700 Standard General Conditions of the Construction Contract <br /> Copyright©2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 2 of 62 <br /> 00 72 05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.