Laserfiche WebLink
25.Liens—Charges, security interests, or encumbrances upon Project funds, real property, or <br /> personal property. <br /> 26. Milestone—A principal event specified in the Contract Documents relating to an <br /> intermediate completion date or time prior to Substantial Completion of all the Work. <br /> 27.Notice of Award—The written notice by Owner to the Successful Bidder stating that upon <br /> timely compliance by the Successful Bidder with the conditions precedent listed therein, <br /> Owner will sign and deliver the Agreement. <br /> 28.Notice to Proceed—A written notice given by Owner to Contractor fixing the date on which <br /> the Contract Times will commence to run and on which Contractor shall start to perform <br /> the Work under the Contract Documents. <br /> 29. Owner—The individual or entity with whom Contractor has entered into the Agreement and <br /> for whom the Work is to be performed. <br /> 30.PCBs—Polychlorinated biphenyls. <br /> 31. Petroleum—Petroleum, including crude oil or any fraction thereof which is liquid at <br /> standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds <br /> per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, <br /> kerosene, and oil mixed with other non-Hazardous Waste and crude oils. <br /> 32.Progress Schedule—A schedule, prepared and maintained by Contractor, describing the <br /> sequence and duration of the activities comprising the Contractor's plan to accomplish the <br /> Work within the Contract Times. <br /> 33. Project—The total construction of which the Work to be performed under the Contract <br /> Documents may be the whole, or a part. <br /> 34. Project Manual—The bound documentary information prepared for bidding and <br /> constructing the Work. A listing of the contents of the Project Manual, which may be bound <br /> in one or more volumes, is contained in the table(s) of contents. <br /> 35.Radioactive Material—Source, special nuclear, or byproduct material as defined by the <br /> Atomic Energy Act of 1954(42 USC Section 2011 et seq.) as amended from time to time. <br /> 36.Resident Project Representative—The authorized representative of Engineer who may be <br /> assigned to the Site or any part thereof. <br /> 37. Samples—Physical examples of materials, equipment, or workmanship that are <br /> representative of some portion of the Work and which establish the standards by which such <br /> portion of the Work will be judged. <br /> 38. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required <br /> submittals and the time requirements to support scheduled performance of related <br /> construction activities. <br /> EJCDC C-700 Standard General Conditions of the Construction Contract <br /> Copyright©2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 3 of 62 <br /> 00 72 05 <br />