My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res. #15-036 - Approving Plans & Specs. & Ordering Ad. For Bids
Centerville
>
City Council
>
Resolutions
>
2000-2023
>
2015
>
Res. #15-036 - Approving Plans & Specs. & Ordering Ad. For Bids
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 9:10:24 AM
Creation date
11/10/2015 9:47:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction, and furnishing, installing, and incorporating all materials and equipment into <br /> such construction, all as required by the Contract Documents. <br /> 51. Work Change Directive—A written statement to Contractor issued on or after the Effective <br /> Date of the Agreement and signed by Owner and recommended by Engineer ordering an <br /> addition, deletion, or revision in the Work, or responding to differing or unforeseen <br /> subsurface or physical conditions under which the Work is to be performed or to <br /> emergencies. A Work Change Directive will not change the Contract Price or the Contract <br /> Times but is evidence that the parties expect that the change ordered or documented by a <br /> Work Change Directive will be incorporated in a subsequently issued Change Order <br /> following negotiations by the parties as to its effect, if any, on the Contract Price or <br /> Contract Times. <br /> 1.02 Terminology <br /> A. The words and terms discussed in Paragraph 1.02.13 through F are not defined but, when used <br /> in the Bidding Requirements or Contract Documents, have the indicated meaning. <br /> B. Intent of Certain Terms or Adjectives: <br /> 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as <br /> directed" or terms of like effect or import to authorize an exercise of professional judgment <br /> by Engineer. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," <br /> "satisfactory," or adjectives of like effect or import are used to describe an action or <br /> determination of Engineer as to the Work. It is intended that such exercise of professional <br /> judgment, action, or determination will be solely to evaluate, in general, the Work for <br /> compliance with the information in the Contract Documents and with the design concept of <br /> the Project as a functioning whole as shown or indicated in the Contract Documents <br /> (unless there is a specific statement indicating otherwise). The use of any such term or <br /> adjective is not intended to and shall not be effective to assign to Engineer any duty or <br /> authority to supervise or direct the performance of the Work, or any duty or authority to <br /> undertake responsibility contrary to the provisions of Paragraph 9.09 or any other provision <br /> of the Contract Documents. <br /> C. Day: <br /> 1. The word "day" means a calendar day of 24 hours measured from midnight to the next <br /> midnight. <br /> D. Defective: <br /> 1. The word "defective," when modifying the word "Work," refers to Work that is <br /> unsatisfactory, faulty, or deficient in that it: <br /> a. does not conform to the Contract Documents; or <br /> b. does not meet the requirements of any applicable inspection, reference standard, test, or <br /> approval referred to in the Contract Documents; or <br /> EJCDC C-700 Standard General Conditions of the Construction Contract <br /> Copyright©2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 5 of 62 <br /> 00 72 05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.