Laserfiche WebLink
39. Schedule of Values—A schedule, prepared and maintained by Contractor, allocating <br /> portions of the Contract Price to various portions of the Work and used as the basis for <br /> reviewing Contractor's Applications for Payment. <br /> 40. Shop Drawings—All drawings, diagrams, illustrations, schedules, and other data or <br /> information which are specifically prepared or assembled by or for Contractor and <br /> submitted by Contractor to illustrate some portion of the Work. <br /> 41. Site—Lands or areas indicated in the Contract Documents as being furnished by Owner <br /> upon which the Work is to be performed, including rights-of-way and easements for access <br /> thereto, and such other lands furnished by Owner which are designated for the use of <br /> Contractor. <br /> 42. Specifications—That part of the Contract Documents consisting of written requirements for <br /> materials, equipment, systems, standards and workmanship as applied to the Work, and <br /> certain administrative requirements and procedural matters applicable thereto. <br /> 43. Subcontractor—An individual or entity having a direct contract with Contractor or with any <br /> other Subcontractor for the performance of a part of the Work at the Site. <br /> 44. Substantial Completion—The time at which the Work (or a specified part thereof) has <br /> progressed to the point where, in the opinion of Engineer, the Work (or a specified part <br /> thereof) is sufficiently complete, in accordance with the Contract Documents, so that the <br /> Work (or a specified part thereof) can be utilized for the purposes for which it is intended. <br /> The terms "substantially complete" and"substantially completed" as applied to all or part of <br /> the Work refer to Substantial Completion thereof. <br /> 45. Successful Bidder—The Bidder submitting a responsive Bid to whom Owner makes an <br /> award. <br /> 46. Supplementary Conditions—That part of the Contract Documents which amends or <br /> supplements these General Conditions. <br /> 47. Supplier—A manufacturer, fabricator, supplier, distributor, materiahnan, or vendor having a <br /> direct contract with Contractor or with any Subcontractor to furnish materials or equipment <br /> to be incorporated in the Work by Contractor or Subcontractor. <br /> 48. Underground Facilities—All underground pipelines, conduits, ducts, cables, wires, <br /> manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any <br /> encasements containing such facilities, including those that convey electricity, gases, steam, <br /> liquid petroleum products, telephone or other communications, cable television, water, <br /> wastewater, storm water, other liquids or chemicals, or traffic or other control systems. <br /> 49. Unit Price Work—Work to be paid for on the basis of unit prices. <br /> 50. Work—The entire construction or the various separately identifiable parts thereof required <br /> to be provided under the Contract Documents. Work includes and is the result of <br /> performing or providing all labor, services, and documentation necessary to produce such <br /> EJCDC C-700 Standard General Conditions of the Construction Contract <br /> Copyright©2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 4 of 62 <br /> 00 72 05 <br />