Laserfiche WebLink
SECTION 00 31 00 <br /> AVAILABLE PROJECT INFORMATION <br /> PART 1 GENERAL <br /> 1.01 SUMMARY <br /> A. Section Includes <br /> 1. Technical Data. <br /> 1.02 TECHNICAL DATA <br /> A. The Technical Data is identified in the Supplementary Conditions. Bidders are responsible <br /> for their own interpretation,verification, and use of the Technical Data contained in these <br /> reports and drawings consistent with the General Conditions and Supplementary <br /> Conditions. Reports, drawings, and other information regarding the Project may be <br /> available for Bidder's review at Engineer's office.Schedule a viewing time with the Project <br /> Manager. <br /> B. Portions of reports and drawings used by the Engineer in the preparation of Bidding <br /> Documents are attached to this Section. A list of attachments to this Section include: <br /> 1. Report dated November 29, 2007, prepared by Braun Intertec entitled, "A <br /> Geotechnical Evaluation Report". Note:Specify Technical Data that will be posted to <br /> our web store in paragraph C below. Delete this paragraph if you have none. <br /> C. Portions of reports and drawings used by Engineer in the preparation of Bidding <br /> Documents are available at www.questcdn.com for$20 by inputting QuestCDN eBidDoc <br /> #4138922 on the website's Project Search page. <br /> PART 2 PRODUCTS <br /> Not Used. <br /> PART 3 EXECUTION <br /> Not Used. <br /> END OF SECTION <br /> AVAILABLE PROJECT INFORMATION <br /> 0 2015 Stantec 1 193803352 0031 00-1 <br />