Laserfiche WebLink
event that the duration of a power disruption is expected to exceed <br /> three(3)hours; <br /> 4.1.1.3 Facilities of good and durable quality, generally used in high- <br /> quality,reliable systems of similar design; <br /> 4.1.1.4 A System that conforms to or exceeds all applicable FCC technical <br /> performance standards, as amended from time to time, which <br /> standards are incorporated herein by reference, and any other <br /> applicable technical performance standards. Upstream signals shall <br /> at all times meet or exceed manufacturers' specifications for <br /> successful operation of upstream equipment provided by the <br /> Grantee or approved for use by the Grantee at any Subscriber's <br /> premises. End of the line performance must meet or exceed FCC <br /> specifications at the end of the Subscriber Drop; <br /> 4.1.1.5 A System shall, at all times, comply with applicable federal, State <br /> and local rules, regulations, practices and guidelines pertaining to <br /> the construction, upgrade, operation, extension and maintenance of <br /> Cable Systems, including, by way of example(but not limitation): <br /> (A)National Electrical Code, as amended from time to time; and <br /> (B)National Electrical Safety Code (NESC), as amended from <br /> time to time; <br /> 4.1.1.6 Facilities and equipment sufficient to cure violations of FCC <br /> technical standards and to ensure that Grantee's System remains in <br /> compliance with the standards specified in subsection 4.1.1.5; <br /> 4.1.1.7 Such facilities and equipment as necessary to maintain, operate and <br /> evaluate the Grantee's System for compliance with FCC technical <br /> and customer service standards, as such standards may hereafter be <br /> amended; <br /> 4.1.1.8 Status monitoring equipment to alert the Grantee when and where <br /> back-up power supplies are being used, which capability shall be <br /> activated and used on or before the completion of the System <br /> Upgrade; <br /> 4.1.1.9 All facilities and equipment required to properly test the System <br /> and conduct an ongoing and active program of preventative and <br /> demand maintenance and quality control, and to be able to quickly <br /> respond to customer complaints and resolve System problems; <br /> 18 <br />