Laserfiche WebLink
the entire 2040 Transp ration Policy Plan can be found sit the metropolitan Council's <br />webslte. h Y a/�w #vcj1- • an � + y HIV l <br />�-Pl*- L1J. a. The format of the plan is <br />slighli d&runt tha- EstTrajJ_sporfafion Policy Plans. An introductory Overview, Chapter 1; EAsting <br />System and Chapter 1 D: Equity and Environmental Justice have been added to this version of the TPR <br />in addition to the changes noted in the first paragraph. Please note some modifications have been <br />made to the appendices as well. <br />Key Changes in the 2040 TransportaUon Policy Plan <br />Adopted by the Metropolitan Council in January 2015, the revised 2040 Transportation Policy Plan <br />incorporatesthe following changes: <br />Metropolitan Highway System - Chapter 5 <br />The Metropolitan Highway System is made up of principal arterials, shown in Fig 1-1 of the rPP and <br />also attached to this system statement. Although no new highways have been added to this system in <br />the 2040 TPP, the last incomplete segment of this system, TH 690, is now under construction in Maple <br />Grove - <br />The TPP acknowledges that congestion cannot be eliminated or greatly reduced. The region's <br />nobility efforts will need to focus on mans ging congestion and working to provide alternatives, <br />The majority of resources available between now and 2040 YAil be needed for preservation,, <br />management and operation of the existing highway system. <br />Due to increased costs and decreased revenue expectations, many long -planned major projects <br />to add general purpose highway lanes are not in this fiscally constrained plan. While the <br />preservation, safety, and mobility needs of these corridors are recognmed, investments in these <br />corridors will be focused on "Implementing traffic management strategies, lower cast -high beneft <br />spot mobility improvements, and implementing MnPASS lanes. Some specific projects have <br />been identified in this plan, but funding has primarily been allocated into various investment <br />categories rather than specific projects. The highway projects spedfically identified in the <br />Currant Revenue Scenario are shown in Figure 5-8 of the TPP which is also attached to this <br />system statement. <br />+ Modifications were made to Appendix D - Functional Classification Criteria, and Appendix F -- <br />Highway Interchange Requests. Appendix C — Prgf ect List is new and contains all of the transit <br />and highway projects that have been identified between 2014 and 2023. <br />Transit System - Chapter 6 <br />The transit system plan provides an overview of the basic components of transit planning, including <br />demographic factors, transit route and network design factors and urban design factors that support <br />transit usage. Local governments have the primary responsibility for planning transit -supportive land <br />use, through their comprehensive planning, and subdivision and zoning ordinances. <br />• The TPP includes updated Transit Market Areas (shown in TPP Figure 6-3, also attached) which <br />reflect 201 ❑ Census information and an updated methodology that better aligns types and levels of <br />transit service to expected demand. These market areas identify the types of transit services that <br />are provided within each area. <br />+ The TPP includes limited capital funding for transit expansion and modernization. Opportunities <br />primarily exist through competitive grant programs such as the regional solicitation for US DOT <br />Page - 7 1 2015 SYSTEM STATEMENT - CENTERVILLE TRANSPORTATION <br />