Laserfiche WebLink
<br />" <br /> <br />.ft BoIltitl.... <br /> <br />Memo u=' <br /> <br />&.-s&",",*- <br /> <br />volunteer opportunities. The city does not have a designated hotline for citizen complaints regarding water <br />quality, however people can call city hall and register complaints. <br /> <br />MCM 3 - illicit Discharae <br />The entire Centerville storm sewer system has been mapped including pipes, ponds, ditches and drainage <br />structures. This mapping is continually updated with every development <br /> <br />The city has nuisance ordinances and standards in effect to prohibit dumping in the public right of way. Dry <br />weather flows are typically a rare event and they are usually determined after the fact. Public employees <br />Informally watch for dry weather flow as well as other out of the ordinary storm water occurrences. The city <br />will attempt to determine the source of any dry weather flows that are discovered through the use of smoke <br />testing or other methods. Smoke testing has been used also to attempt to define the location of drain tile <br />systems. The drain tile systems are stand alone systems and do not drain into the MS4, however they. do <br />tend to outlet ~t the same locations as the storm sewer outlets. There are no known illicit connections <br />perceived by staff. <br /> <br />There are no specific codes regarding private sanitary system inspections. There have not been any <br />citizen complaints, but failed septic systems have been discovered and corrected. <br /> <br />MCM 4 - Construction Site Runoff Control <br />All development activities in Centerville are required to go through a plan review process, as regulated by <br />the ~ Creek Watershed. New developments need to have a construction n reviewed, which Includes <br />the following erosion control measures: <br />lJ Inspecting all hookups to city utilities . <br />lJ . Silt fence at the curb line <br />lJ Construction entrances <br />lJ Weekly street sweeping <br /> <br />The city has a process in place for inspections and enforceme <br />process has been effective in controlling construction site run <br />required for each new development within the city. P i <br />Credit, which can be held to enforce construction <br />the city and are performed at regular checkpoin <br />sweeping and dust control, which has bee . <br />circumstances, tempora basins <br />These are included a <br /> <br /> <br />The city observed that this <br />eloper's agreement <br />ent involves a Letter of <br />s are contracted out by <br />o requires weekly <br />e developers. In some <br />rot n has been employed. <br />RCWD. <br /> <br />MCM 5 - Post-Co <br />Centerville mainta <br />utilizes National U <br />for seeding or sod <br />zones around wetl <br />Management Plan <br /> <br />MCM 6 - Pollutio . ood ousekee in <br />All streets are sw once a year and sporadically over the summer. This is contracted out as a <br />cost shared servi ity of Lino Lakes. The city also coordinates with Lino Lakes on salt and sand <br />used for roadway . Currently, Centerville trucks the salt and sand from Lino Lakes on an as needed <br />basis and the umi portions are stored indoors inside the trucks. The 6% salt and 94% sand mixture is <br />applied to interse .ons and hills as well as near city hall and schools. The public works truck garage does <br />not have fueling station on-site so fleet trucks utilize local commercial gas stations. The building now has a <br /> <br />nd skimmers on pond outlets. The city <br />s when sizing ponds. The city has requirements <br />r of occupancy. Requirements regarding buffer <br />ctlon plan will be discussed In the Storm Water <br /> <br />Bonestroo, Rosene, Anderlik and Associates, Inc. <br />2335 West Highway 36 + St. Paul, MN 55113 + Phone: 651-636-4600 + Fax: 651-636-1311 <br />