Laserfiche WebLink
<br />Item <br /> <br />Part 6 - Water Main - Outside Plat <br /> <br />Connect to existing water main <br />10" HOPE water main - directional drill <br />8" HOPE water main - directional drill <br />8" gate valve and box, in place <br />Hydrant <br />Ductile iron fittings <br />Remove and replace bituminous pavement <br />Sawing bituminous pavement <br />Joint Restraint <br />Sodding <br /> <br />Unit Qty Unit Price Total Price <br />EA 3 $1,000.00 $3,000.00 <br />LF 2200 $37.00 $81,400.00 <br />. LF 250 $30.00 $7,500.00 <br />EA 4 $800.00 $3,200.00 <br />EA 4 $3,000.00 $12,000.00 <br />EA 15 $325.00 $4,875.00 <br />SY 175 $25.00 $4,375.00 <br />LF 300 $5.00 $1,500.00 <br />EA 50 $50.00 $2,500.00 <br />SY 750 $3.50 $2,625.00 <br /> Subtotal $122,975.00 <br /> 5% Contingency $6,149.00 <br /> Total Construction Costs $129,124.00 <br /> 30% Indirect Costs $38,737.00 <br /> Total Part 6 $167,861.00 <br />EA 44 $125.00 $5,500.00 <br />EA 44 $175.00 $7,700.00 <br />. LF 450 $12.00 $5,400.00 <br />LF 1650 $20.00 $33,000.00 <br /> Subtotal $51,600.00 <br /> 5% Contingency $2,580.00 <br /> Total Construction Costs $54,180.00 <br /> 30% Indirect Costs $16,254.00 <br /> Total Part 7 $70,434.00 <br /> <br />Part 7 - Services - Outside Plat <br />1" corporation stop <br />1" curb stop and box <br />1" Type "K" copper water service <br />1" Type "K" copper water service - drilled <br />