My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-07 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2017
>
2017-02-07 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 1:45:53 PM
Creation date
2/2/2017 3:41:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONDI FlOIIS" AL USE PERMIT RESPONSES FOR THE PROPOSED <br />RUFFRIDGE J01 INSON NEW FACH IT CENTERVILLE, MN <br />Ruffridge-Johnson Equipment Company has been a distributor of roadway, construction and mining <br />eq . u . ipment to government and the building industry for over 75 years. We are specialists io tb <br />p payiw« <br />r If <br />Our previous discussions with the City of Centerville officials have resulted with us entering into a <br />purchase agreement with the City for an approximate 5 acre parcel of land to relocate our business <br />facilities. We are very excited about our decision to relocate our business to the City of Centerville and <br />look forward to meeting the required approvals to begin the process, <br />We have prepared our required Site Plan Submittal materials, and as Part of this submittal we have <br />prepared this memorandum as required for the Conditional Use oermit eort� <br />I =Qewm-1 <br />"'—"ars—O—u—Mu—siness is similar to those allowed in the B-1 Commercial and Inustrial Uses. <br />Particular dsimilar uses listed under B-1 are: Automobile and motorized equipment sales and service, and <br />Building Supply sales and storage yards. <br />Per the Conditional Use requirements under item 2 (a), (b) and (c) we offer the following comments for <br />your consideration: <br />a. We believe that relocating our facility into Centerville is desirable in that we will be contributing <br />to the City tax base, we have employees that will Purchase items in the area and we are <br />purchasing the property from the City for our relocation. <br />b. Our proposed facility will not cause adverse effects on the adjacent properties, our new facility <br />will blend well with the existing commercial property in the area and will have a pleasing <br />appearance and will have a fully landscaped perimeter to meet the City Zoning Code. Traffic <br />conditions to and from our facility are very minimal. We believe the public safety, health and <br />welfare will not be compromised by our business. <br />C. Our facility has been designed to meet our needs and to be within the requirements of the B-1 <br />Commercial zoning district. Future development of open adjacent parcels and existing <br />neighboring facilities will not be hindered by our facility and use of our property. We take pride <br />in keeping our facility neat and orderly at all times and place this as a key component of our <br />success. <br />it- es aclequately our firm desire to build a facility that we and The City of <br />Centerville will be proud of. We look forward to your review of our proposed project at Planning <br />Commission and City Council and are ready to answer any addition questions <br />ou <br />concerning our project. <br />Thank y. <br />
The URL can be used to link to this page
Your browser does not support the video tag.