My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-05-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-05-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2010 2:24:16 PM
Creation date
5/5/2006 12:27:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />city Council 04-26-2006, 7:45 p.m. <br />~~ of Work Session <br /> <br />Present were Mayor Mary Capra, Council members Michelle Lakso, Richard Terway, <br />Jeft'Paar and Tom Lee. Also present were Tom Peten10n ofBonestroo & Assoc, and <br />Kurt Glaser, City attorney. <br /> <br />1. The C.ounci1 discussed the implementatiOll of the downtown redevelopment and the <br />need to remain resolved. Requests may come in for variances to do things that are <br />not in compHance with the plan. Allowing significant investment in noDCODformiag <br />uses could undermine the chances for success. Dallas Larson and John Meyer will <br />brins back an Ot""1I8 for a r~ for development proposals in two weeks. <br />2. The Council reviewed the 21 AvenuelBackage Road and industrial site project and <br />its status. An undisclosed easemeat to Rice Creek Watershed District was <br />discovered through a survey. The entire site of the proposed industrial development <br />would be unbuiIdabIe if the easement were not released by RCWD. It is believed <br />that RCWD will release the easement, but that must be confirmed. The City has <br />been unable to negotiate easements with Sheehy Consuuction, so the attorney will <br />be proceedi1tg with the condetnnation of the needed right of way and easements. <br />The County permit for CSAH 54 entrance has been applied for and a right turn lane <br />will be required. Bids will be received on May 4 and the Joint Powers Agreement <br />with Lino Lakes for 21 sl Avenue is on their agenda for May 9". Bond financing <br />procedures have been initiated. <br />3. The Council reviewed the CSAH 14 project and the construction schedule that is <br />being suggested by Anoka County. The county would conStruct the east end of the <br />project between the interchange at 3SE and Clearwater Creek: and the north end of <br />the project from Mound Trail to 3SW in 2007 and the middle section of the project <br />in 2008. The Council would like the downtown area up to Centerville Lake added to <br />2007 construction, if possible. This facilitate the redevelopment of the downtown. <br />4. Dallas Larson reported that the principals ofBonestroo, Rosene, Anderlik and <br />Associates would like to assign a ditTerent engineer to Centerville to take over the <br />various projects. The Council agreed that could be a good idea and asked that the <br />firm bring the proposed engineer to the next meeting for introductions. <br /> <br />The meeting was adjourned at 8:45 p.rn. <br /> <br />Dallas Larson <br />City Ad1tlinistrator <br /> <br />f <br />
The URL can be used to link to this page
Your browser does not support the video tag.