Laserfiche WebLink
Anoka County Contract No. 2013-0626A <br />AMENDMENT NO. 1 <br />TO JOINT POWERS AGREEMENT <br />FOR THE RECONSTRUCTION OF <br />COUNTY STATE AID HIGHWAY 21(CENTERVILLE ROAD) FROM COUNTY STATE AID <br />HIGHWAY 34 (BIRCH STREET) TO CSAR 14 (MAIN STREET) IN THE CITIES OF <br />CENTERVILLE AND LINO LAKES, MN <br />COUNTY PROJECT NO. S.A.P. 002-621-10 <br />THIS AMENDMENT is made and entered into this d9bt day of <br />2014, the date of the signature of the parties notwithstanding, by and between the County of <br />Anoka, a political subdivision of the State of Minnesota, 2100 Third Avenue, Anoka, Minnesota <br />55303, hereinafter referred to as the "County," and the City of Centerville, 1880 Main Street, <br />Centerville, Minnesota 55038, hereinafter referred to as the "City". <br />WITNESSETH: <br />WHEREAS, it is mutually agreed upon that the County and the City wish to amend its <br />Joint Powers Agreement for the reconstruction of CSAH 21 (Centerville Road) between CSAH <br />34 (Birch St) and CSAH 14 (Main St), hereinafter referred to as the "Project"; and, <br />WHEREAS, Section XII. ENTIRE AGREEMENT REQUIREMENT OF A WRITING of <br />said Agreement provides that any alterations, variations or modifications of the provisions of this <br />Agreement shall be valid only when they have been reduced to writing and duly signed by the <br />parties. <br />NOW, THEREFORE, in consideration of the mutual covenants hereinafter stated or <br />contained in the Agreement, the parties do hereby agree as follows: <br />1. The parties agree to delete Section III "Costs" of Anoka County Contract <br />No. 2013-0526 in its entirety and replace it with the following: <br />The contract costs of the work, or if the work is not contracted, the cost of all labor, <br />materials, normal engineering costs and equipment rental required to complete the work, shall <br />constitute the actual "construction costs" and shall be so referred to herein. "Estimated costs" <br />are good faith projections of the costs, which will be incurred for this project. Actual costs will <br />vary and those will be the costs for which the relevant parties will be responsible. <br />This cost estimate includes a storm sewer cost share for the project of 75% City/25% County. <br />31 <br />