Laserfiche WebLink
(A� <br />April 26, 2017 <br />Mike Ericson <br />Page 6 of 7 <br />Reference: City of Centerville Local Water Plan <br />commence data collection and model updating. Stantec anticipates providing the completed, <br />draft surface water plan for City review within six months of the authorization to proceed. We <br />would be happy to adjust our schedule to meet the needs of the City. The team providing <br />services will include Dan Edgerton as project manager and Tyler Johnson as lead engineer, with <br />others supporting as needed. <br />Stantec will provide services on an hourly basis and estimates the level of effort required to be <br />$24,000 in accordance with the above work plan. Reimbursable expenses are included in this <br />proposed figure. Stantec will not exceed the hourly amount without further authorization from <br />you. <br />This letter represents the understanding between the City and Stantec in respect to the Project <br />and may only be modified in writing signed by both of us and is subject to the current Master <br />Services Agreement between the City of Centerville and Stantec. <br />Design with community In mind <br />92 <br />