My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-26 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2017
>
2017-07-26 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2017 4:48:09 PM
Creation date
7/24/2017 4:33:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o If deadline passes and fee is not paid, it will be added to your property <br />taxes for 2019 at the 2019 rate ($8,000) <br />o For the foreseeable future, there will be no deadline to hook to water. <br />Hook-up will be required when triggered: <br />Upon sale of the property <br />Upon well failure (in excess of $1,000) <br />Upon application for building permit which adds more than XX SF <br />of an addition to the home <br />o The WAC fee (currently $1,800) is due upon hook up to city water along <br />with other applicable inspection fees <br />Going forward, where water main and lateral connections become available, the resident <br />must connect within 1 -year, or that deadline is waived if they pay the Lateral Fee and <br />agree to connect upon the sale of the property, well failure or application for a large <br />building permit. <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.