My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-05-24 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-05-24 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2006 12:30:41 PM
Creation date
5/19/2006 12:30:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Centerville <br />Council Meeting Minutes <br />May 10, 2006 <br />no one called Lino and the feedback was turned off and there were calls with no water. <br />He then said that there will be a procedure put in place to ensure that the interconnect <br />with Lino is open and available for issues like this in the future. <br /> <br />City Administrator Larson indicated that Mr. Shudy is proposing to connect to City water <br />and was going to directionally drill to do so but the question is whether the City should <br />upsize it to 8 inch to service the industrial area of Rehbein develops. He then estimates <br />an additional cost of $4.000 to $5.000 for extra pipe size and 350 feet of all the cost for a <br />total of$12,000 to $15,000 to get it to the east city limit line and provide a hydrant. <br /> <br />Mayor Capra said she would like to do the upsizing and put the hydrant at Shudy's <br />property and get it to the end of the lot line and have Rehbein connect when needed. <br /> <br />2. Business Person Update <br /> <br />Nothing to report. <br /> <br />3. City Bonding <br /> <br />Mayor Capra indicated that Mr. Meyer is looking at bonds for Hunter's Crossing and the <br />backage road and she had asked for clarification on whether cities can do their own <br />bonding and she wants to verify with Juran and Moody because she is not comfortable <br />with the City doing it on its own and wants to verify that a savings in the short term does <br />not affect the City negatively in the long term. <br /> <br />City Administrator Larson indicated that Staff needs additional time to research and <br />properly answer the questions and concerns. <br /> <br />4, Business Picni~ <br /> <br />Council Member Paar indicated the City Ca.T1 use the Pa.rish Community Center at St. <br />Genevieve for the business picnic. He then asked for Staff and Council to divide the <br />tasks involved in planning the event. <br /> <br />X. ADJOURNMENT <br /> <br />Motion by Council Member Terway. seconded by Council Member Paar to adiourn <br />~~ M,y 10.2006 Citt Coun~il ~e~tiQe at 8:~ p,m. All ill r,vor. ~otion 9U1ied <br />unanimously. <br /> <br />Transcribed by: <br /> <br />Joan Lenzmeier, Recording Secretary <br />TimeSaver Off Site Secretarial, Inc. <br /> <br />Page 10 of 10 <br /> <br />/() <br />
The URL can be used to link to this page
Your browser does not support the video tag.