Laserfiche WebLink
Summary of comments received relating to Rice Creek Chain of Lakes Park Reserve Master Plan <br /> Amendment: <br /> Relating to the Park: <br /> 1. Add 1 bench between the entrance and the 1st turn looking out over the field and one at the <br /> boat launch dock area. <br /> a. Response: These bench locations will be reviewed and installed if feasible. <br /> 2. We need to include the importance of the historical and cultural resources in the area. <br /> a. Response: The Campground Visitor Center contains information regarding the <br /> significance of the history and cultural resources in the area. The County is proposing to <br /> provide additional interpretive information as part of this master plan amendment. <br /> 3. With Waterworks finally being torn down,the unofficial boat and snowmobile access will be <br /> gone. How will that affect the park? <br /> a. Response: The County works with the snowmobile club on a regular basis,which <br /> provides the maintenance for the snowmobile trails. The County does not anticipate <br /> there to be any adverse effects to the park because of this change. The boat launch <br /> may see an increase in traffic, but the launch parking lot is limited to 28 vehicle and <br /> trailer stalls and 10 vehicle only stalls. <br /> 1. Add a fishing pier on Centerville Lake. <br /> a. Response: This has been incorporated into the development concept of the master plan <br /> amendment. <br /> 2. Add a longer fishing pier at Peltier. <br /> a. Response: The County is currently in the process of procuring and installing a 104 feet <br /> long pier. This will be the longest pier in our system and the longest that we can <br /> purchase from the vendor. Due to maintenance challenges, 104 feet is our maximum <br /> length. <br /> 3. Upgrade the marketing info within the park.Create a kiosk of some sort to promote the <br /> programs at Wargo. <br /> a. Response:Going forward,the County is planning on implementing digital monitors in <br /> indoor and covered locations throughout the park system to provide relevant,up-to- <br /> date information for our patrons. <br /> 4. Trim/remove the trees for ease of seeing the park entrance sign. <br /> a. Response: The vegetation at all vehicular entrances will be reviewed and trimmed if <br /> necessary. <br /> 5. Aqua Lane needs to be addressed. <br /> a. Response: The County is anticipating receiving funds to address the issues related to <br /> Aqua Lane in 2018/19. <br /> 6. Add a Micro-brewery <br /> a. Response:While the County understands the desire of micro-breweries,a micro- <br /> brewery is not considered a compatible use for a regional facility and does not meet an <br /> outdoor recreational need in the system. Refer to Minn Stat.473.147,Subd. 1 and Minn. <br /> Stat.473.121,Subd. 14. <br /> 7. Add horse trails wide enough for two people to ride side by side <br />