My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-01-08 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2003
>
2003-01-08 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2006 11:42:37 AM
Creation date
5/22/2006 11:41:15 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STRATEGIC PLANNING AND GOAL SETTING <br />2003 <br /> <br />1. The following items are projects that need to be completed in 2003 as required by <br />either federal or state law. <br /> <br />NPDES - Randy Neprash, Bonestroo, et al and Staff <br />Surface Water Management <br />Pond Inventories <br />Water Tower <br /> <br />II. Proposed goals and strategic planning issues as determined by City Staff. <br /> <br />SENSYS - <br />Implementation of this remote utility reading program. The <br />computers and software are in place. New construction has had the <br />remote monitors installed. Staff will need to complete the <br />installations of these monitors for existing commercial, industrial <br />and residential stmctures. Staff members have had initial training <br />on the system. Ongoihgtraimnghas been scheduled. <br /> <br />FEASIBILITY STUDIES - <br />Street Reconstruction Plan needs to be done to better assess <br />reconstruction activities for the City's streets. <br /> <br />Streetscape Design and Plan for Main Street and the Downtown <br />streets. The thought was to get out in front of the County's <br />reconstruction and improvements plans for that portion of CSAH <br />14 that goes through Centerville and integrating what the City <br />wants with what the County has planned. <br /> <br />Water Looping/Main Construction Plan needs to also be in place <br />when streets are being proposed for new developments and when <br />they need to be reconstructed. Street reconstruction offers an <br />opportunity to replace or repair water mains, sewer pipes and other <br />utilities that exist under the streets. <br /> <br />ESTABLISH DOWNTOWN/MAIN STREET TASK FORCE (6 - 8 members) <br /> <br />SPECIAL ASSESSMENT POLICY <br />Establish a special assessment policy that is more equitable and <br />fair. Staff suggests investigating the use of percentages. . <br /> <br />COMPUTER / TECHNOLOGY REPLACEMENT PLAN (similar to CIP) <br /> <br />REVISE COMPREHENSIVE LAND USE PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.