EXHIBIT D
<br /> ELECTRICAL FEES
<br /> Individual/separate inspection(installation,replacement,alteration or repair)...... ...........:.,,.......,..,..........545,00
<br /> Services,generators,feeders to separate structures and other power supply rurces:
<br /> 1. 0 ampere to and including 200 ampere capacity....................e..,.,,,,..,.,,,.,.,...,,.,,......,......$45,00
<br /> 2. Each additional 100 amps or fraction thereof... ......_..an add'l V0.00
<br /> 3. For services and circuits operating at over 250 volts ...... ..........(Scheduled fee doubles)
<br /> Circuits,feeders,feeder taps,or sets of transformer secondary conductors-
<br /> I. 0 ampere to and including 30 ampere capacity...,..° $8,00
<br /> 2, 31 amps to 100 amps._...,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,a..,.................°... ....... ...... ......... 10.00 ea.
<br /> 3. Each additional 100 amps..., ....... ...... an add'I$5,00
<br /> Orm-Fansily dwelling and each dwelling unit of a two-family dwelling......... ...... ............5175.001
<br /> Up to and including 200 amps service(includes not more than three inspections)
<br /> Multifamily dwellings...__......__....._ ......,.,Q........., .. ........................ Sl 00.00
<br /> Each existing circuits or feeders reconnected to replacement panels(new or extended circuits or feeders at the
<br /> abovefees) ...............a..,..,.,.,.,... ,..,,.,...,....,,..,..,,,,,.,.........._....__...... ...._$3.00
<br /> Electrical supply for each manufactured home park lot......................a...................,..,, ,.,,W,.,. ...............545.0001
<br /> Recreational vehicle site,electrical supply equipment...__....... .......... ...°..°,a.°.$10.00 ea.
<br /> Street,parking lot or outdoor area lighting standards...................°.....,,,,,.,,,..,. ....... ........__$8.00
<br /> Transformers for light,heat and power:
<br /> 1. Up to and including 10 kilo-volt amps._........... ...... ........a..,..,......",.,520.0000 ea.
<br /> 2. Over 10 kilo-volt amps..... ...... ,.......,..,...,.".,....,S400.003 ca.
<br /> Transformers and electronic power supplies for electric signs and carfline fighting_____........................$9.0001
<br /> Swimming pool bonding inspection(each separate inspectiord.. ............................ ...._$45 00
<br /> (Bonding conductors and connections require an inspection before being concealed)
<br /> Retrofit modifications to existing lighting fixtures.....-.........____......__.................... ...... $.5 01fixture
<br /> Transient Projects-Power supply fees as identified above,plus I hour....... .,,..._,$90.00/hour
<br /> Each attraction or concession inspection........------- ............__........a... ..,,.,.,, ,.,,..,, . ..,...,,,,......._..,.,,....$45.f001
<br /> Special inspection or inspections not covered above the fee is$90,00 per hour plus mileage at the to
<br /> established per the IRS,
<br /> Re-inspection fee when inspection is necessary to determine whether the unsafe conditions have been corrected
<br /> —a fee will be assessed by the inspector..................... ____........... ....... ...... ...____$45,00
<br /> Minimum Fee per Trip... ............... ........ _______$45.00
<br /> *Electrical work commenced without filing the required permit, in addition to the permit fee, shall pay two
<br /> times the permit fee, not to exceed $1,000. *For purposes of interpretation, Minnesota Rules, Chapter 3800,
<br /> Page 13 of 17
<br /> 126
<br />
|