and the most recently adopted edition of the National Electric Code shall be prima Facie evidence of the
<br /> definitions,interpretations,and scope of words and terms used.
<br /> Requests for Electrical Inspection(REI)with a fee of$250 or less expires 12 months from the filing date. The
<br /> contractor must have the work completed within the 12-month period or submit another REI that includes the
<br /> inspection fee for the uncompleted work. Inspection fees do not carry over from one REI to another.
<br /> Subject to State of SIN surcharge fees,
<br /> SOLAR YV SYSTEMS&INSTALLATION
<br /> The following electrical inspection fees will be applicable to solar PV systems and bortallations:
<br /> 3.) The inspection fee for the installation of solar PV systems is:
<br /> 0 watts to and including 5,000 watts............, .a.......e....................s,.,,..,.,,,.,...... ...... $9U0
<br /> 5,001 watts to and including 1.0,000 watts............ .................... .............. ...... ...__$150.00
<br /> 10,001 watts to and including 20,000 watts,......... ...__..._...... ......-...... ....$225,00
<br /> 20,001 watts to and including 30,000 watts.................... ...... _...._$300-00
<br /> 30,001 watts to and including 40,000 watts.............._ ...... ........_......$375-00
<br /> 40,001 watts to and including 1,000,000 watts........._ $375.00 U(Wca. 10,000 watts over 40,001 watts
<br /> 1,000,001 watts to 5,000,000 watts.. $3,975m&$25.00/ea. 10,000 watts over 5,000,000 watts
<br /> 5,000,001 watts andl ......................__$12,975&$1 5,001ea. 10,000 watts over 5,000,001 watts
<br /> b.) For the purpose of paragraph(a),the watt rating is the total estimated alternating current(as)energy
<br /> output of the solar system, The total do energy output is not used.
<br /> C.) The solar PV inspection fees shall include inverters,modules,panels,combiners,converters,charge
<br /> controllers,disconnecting means and electrical conductors between the inverter and the as panelboard
<br /> for stand-Oalone solar PV systems,or the conductors between the inverter and the service equipment or
<br /> other power production,distribution and utilization system,such as a utility system and its connected
<br /> loads,that is external to and not controlled by the solar PV power system.
<br /> d) In addition to the inspection fees in(a),additional inspection fees may be,applicable on large-scale
<br /> projects for the inspection of additional electrical immstructure between the inverter output circuit and
<br /> the electrical production and distribution network The inspection fees shall be calculated according to
<br /> the City of Centerville fees.
<br /> C.) When a plan review is required or performed the plan review fee is$100 per hour.