Laserfiche WebLink
and the most recently adopted edition of the National Electric Code shall be prima Facie evidence of the <br /> definitions,interpretations,and scope of words and terms used. <br /> Requests for Electrical Inspection(REI)with a fee of$250 or less expires 12 months from the filing date. The <br /> contractor must have the work completed within the 12-month period or submit another REI that includes the <br /> inspection fee for the uncompleted work. Inspection fees do not carry over from one REI to another. <br /> Subject to State of SIN surcharge fees, <br /> SOLAR YV SYSTEMS&INSTALLATION <br /> The following electrical inspection fees will be applicable to solar PV systems and bortallations: <br /> 3.) The inspection fee for the installation of solar PV systems is: <br /> 0 watts to and including 5,000 watts............, .a.......e....................s,.,,..,.,,,.,...... ...... $9U0 <br /> 5,001 watts to and including 1.0,000 watts............ .................... .............. ...... ...__$150.00 <br /> 10,001 watts to and including 20,000 watts,......... ...__..._...... ......-...... ....$225,00 <br /> 20,001 watts to and including 30,000 watts.................... ...... _...._$300-00 <br /> 30,001 watts to and including 40,000 watts.............._ ...... ........_......$375-00 <br /> 40,001 watts to and including 1,000,000 watts........._ $375.00 U(Wca. 10,000 watts over 40,001 watts <br /> 1,000,001 watts to 5,000,000 watts.. $3,975m&$25.00/ea. 10,000 watts over 5,000,000 watts <br /> 5,000,001 watts andl ......................__$12,975&$1 5,001ea. 10,000 watts over 5,000,001 watts <br /> b.) For the purpose of paragraph(a),the watt rating is the total estimated alternating current(as)energy <br /> output of the solar system, The total do energy output is not used. <br /> C.) The solar PV inspection fees shall include inverters,modules,panels,combiners,converters,charge <br /> controllers,disconnecting means and electrical conductors between the inverter and the as panelboard <br /> for stand-Oalone solar PV systems,or the conductors between the inverter and the service equipment or <br /> other power production,distribution and utilization system,such as a utility system and its connected <br /> loads,that is external to and not controlled by the solar PV power system. <br /> d) In addition to the inspection fees in(a),additional inspection fees may be,applicable on large-scale <br /> projects for the inspection of additional electrical immstructure between the inverter output circuit and <br /> the electrical production and distribution network The inspection fees shall be calculated according to <br /> the City of Centerville fees. <br /> C.) When a plan review is required or performed the plan review fee is$100 per hour. <br /> Page 14 of 17 <br /> 127 <br />