EXHIBIT E
<br /> LANDFILL,GRADING AND EXCAVATING PERMIT FEES
<br /> GRADING FEES
<br /> General. Fees shall be assessed in accordance with the provisions of this section or shall be as set forth
<br /> in the fee schedule adopted by the jurisdiction,
<br /> Plan Review Fees, When a plan or other data are required to be submitted, a plan review fee shall be
<br /> paid at the time of submitting plans and specifications for review. Said plan review fee shall be set forth in
<br /> Table A33-A. Separate plan review fees shall apply to retaining walls oar major drainage structures as required
<br /> elsewhere in this code. For excavation and fill on the same site, the fee shall be based on the volume of
<br /> excavation or fill,whichever is greater.
<br /> Grading Permit Fees. A fee for each grading permit shall be paid to the City as set forth in Table A33-13.
<br /> Separate permits and fees shall apply to retaining walls or major drainage structures as required elsewhere in
<br /> this code. There shall be no separate charge for standard terrace drains and similar facilities.
<br /> TABLE A33-A GRADING PLAN REVIEW-FEES
<br /> 50 cubic yards(38.2 m3)or ........... ........No Fee
<br /> 51 to 100 cubic,yards(40 m3 to 76.5 ...... ........$37.01
<br /> 101 to 1,000 cubic yards(77.2 nG to 764.6 m3)........ ...... $5818
<br /> 1,001 to 10,000 cubic yards(765.3 m3 to 7645.5 $7737
<br /> 10,001 to 100,000 cubic yards(7646.3 to 7645.5 m3)-$77.57 for the first
<br /> 10,000 cubic yards(7645.5 mG,plus$38.59 for each additional
<br /> 10,000 cubic yards(7645.5 m3)or fraction thereof
<br /> 100,001 to 200,000 cubic yards(7643.6 m3 to 15,291.1 m3)-$424.86 for the
<br /> first 100,000 cubic yet&(7645.5 m3),plus$20.87 for each additional
<br /> 10,000 cubic yards(7645.5 m3)or fraction thereof
<br /> 200,001 cubic yards(15,291.2 m )or more-$633.55 for the first 200,000 is
<br /> yards(15,291,1 m3),plus$11.42 for each additional 10,000 cubic years
<br /> (7645.5 m )or fraction thereof
<br /> Other Fees:
<br /> Additional plan review required by changes,additions or revisions to approved plans
<br /> (minimum charge-one-half hour)--.-�....____... ......................... $79.54 per hour*
<br /> *Or the total hourly cost to the jurisdiction,whichever is the greatest, This cost shall include supervision,
<br /> overhead,equipment,hourly wages and fringe benefits of the employees involved.
<br /> TABLE-A3313-GRADING ph' IT FEES*
<br /> 0 to 100 cubic yards(40 m3 to 76,5 m3).............................................. $60R0
<br /> 101 to 1,000 cubic yards(77.2 m3 to 764.6 m3)-$60.00 for the first 100 cubic yards
<br /> (76.5 m3),plus$27.56 for each additional 100 cubic yards(76.5 m3)or fraction
<br /> thereof
<br /> 1,001 to 10,000 cubic yards(765.3 nO to 7,645.5 m3)-$308,04 for the fast 1,000
<br /> cubic yards(764.6 m3),plus$22.54 for each additional 1,000 cubic yards
<br /> (7645 m3)or fraction thereof
<br /> 10,001 to 100,000 cubic yards(7,646.3 nN to 7,645.5 m3)-$513.60 for the first 10,000
<br /> cubic yards(7,645.5 m3),plus$103.95 for each additional 10,000 cubic yards
<br /> (7,645.3 m3)or fraction themay.
<br /> 100,001 cubic yards(7,645.6 m3)or more-$1,449.15 for the fast 100,000 cubic yards
<br /> (7,645.5 m3),plus$57.49 for each additional 10,000 cubic yards(7,645.5 m3)
<br /> or fraction thereof.