My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2018
>
2018-02-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 1:05:11 PM
Creation date
2/26/2018 3:30:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> CITY OF CENTERVILLE -2018 LOCAL WATER PLAN <br /> CAPITAL IMPROVEMENTS PLAN <br /> TABLE 8.1 -STORMWATER CAPITAL IMPROVEMENTS AND MAINTENANCE ITEMS,20-YR CYCLE COSTS <br /> Back Yard Drainage Improvements $57,500 <br /> LaMotte Stormwater Reuse System $75,000* <br /> Expansion <br /> Hidden Spring Park Reuse System $120,000 <br /> Capital LaMotte Stormwater Reuse System <br /> Improvements Upg $250,000 <br /> rades <br /> $25,000 every 10 years; <br /> Local Water Plan Updates $5,000 every 5 years on <br /> non- LWP cycle years <br /> Total Capital Improvements Costs $562,500** <br /> Storm Water Pond Dredging (note: assumes $1.15 million for public <br /> 1 ft sediment dredged) ponds <br /> Maintenance Storm Water Pond Sediment Disposal $3.13 million for disposal <br /> Items Rain Garden Dredging (note: assumes 1 ft $80,000 <br /> sediment dredged) <br /> Rain Garden Sediment Disposal $240,000 <br /> Total Maintenance Costs $4,600,000 <br /> *Includes, only the city's portion of these costs, per current city policy. <br /> **Includes costs for a 20-year term <br /> 8.33 <br /> 85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.