<br />the Cit, Council is investigating the costs and process to
<br />apron the Peltier Lake Drbe cubert crossing.
<br />
<br />Centerville staff has prepared a cOlparison of the per
<br />capita cost to Centerville residents, utilizing actual costs
<br />of the Circle Pines/Lexington Police Departlent police
<br />service to Centerville and the costs proposed in the Lino
<br />Laies Police Departl8nt police service contract for
<br />Centerville.
<br />
<br />IIOIIClPAL IlCILU'IIS - the Cit., , Council has apprond the
<br />construction of a new lire Ball and Cit, Ball. the
<br />facilities ,ill be adJoiling. 'either facilit, ,ill be
<br />grandiose. Bowever, the, ,ill leet the needa of thia fast
<br />growing Citf. the ne' building ,ill open up a ne, leeting
<br />area for various cOllunit, organizations.
<br />
<br />service to the Cit, of Center,ille through a three ,eal
<br />contract.
<br />
<br />the finaliziDg of the fiDancing of the building ,ill be
<br />decided at the August 12, 1992 Cit, Council leetiDg.
<br />
<br /> 1990 1991 Per Capita
<br />Police Centenille Police SerYice Police SerYice
<br />Smia Pnlulation Cnsts Cnsts
<br />Circle Pines/
<br />Lexington 1,633 $104,734 $64.14
<br />Lino Lakes 1,633 $106,000 $64.91
<br /> 1991 1992 Per Capita
<br />Police Centenille Police SerYice Police Ser,ice
<br />Service Pnpulation Cnsts Cnsts
<br />Circle Pines/
<br />Lexington 1,819 $116,926 $64.28
<br />Lino Lakes 1,819 $114,480 $62.94
<br />The 1992 population estilltes frol the Hetropolitan Council
<br />.ill not be available until Spring of 1993.
<br />
<br />While at the rete Des Lacs celebration on Saturda" August
<br />I, 1992, please stop bf the open house at the current Cit,
<br />Hall to fie. the facilitf currentl, in use and aquaint
<br />,ourself lith the Ie, building plans. The Cit, Ball .ill be
<br />open and conducting business frOl 1:00 p.l. to 3:00 p.l. for
<br />,our convenience.
<br />
<br />Cit, Council I8lbers, lire Departlent representatives and
<br />Cit, Staff ,ill be on hand to address four questions and
<br />show fOU around.
<br />
<br />Coffee and cookies ,ill be served.
<br />
<br />We look forward to leeting .ith 'ou.
<br />
<br />fLOOD PLAII IIDDC!IOI - the Rice Creek Watershed District has
<br />deterlined that the Peltier Lake Drive crossing of Clear
<br />Water Creek IaS not installed to a sufficient size when
<br />constructed in the late 1970's. they ,ill not 10" forward
<br />on the 'lood Plain Reduction project until an adjustlent is
<br />lade to the Peltier Lake Dri,e Culvert. The Peltier 'Lake
<br />Drive Culvert was not originally included in the flood Plain
<br />Reduction project.
<br />
<br />AlllIlfIOI - The annexation hearings have beeD telporaril,
<br />postponed to clear up a discrepanc, regarding an ease.ent on
<br />one of the petitioning properties. The bearings are
<br />expected to resUlt shortl,.
<br />
<br />COlSOLIDAfIOI - At the Jul, 16, 1992 Consolidation COllission
<br />leeting, the Consolidation lelbers discussed the necessit,
<br />of continuing. Ole of the nut steps would be to interview
<br />and bire a consulting fill to continue research on the
<br />issue. lrol quotes requested, it is estillted by Jeff
<br />
|