Laserfiche WebLink
<br /> <br />CITY OF CENTERVILLE <br />N10NTHL Y ENGINEER'S REPORT <br />For June 14,2006 City Council Meeting <br /> <br />Italics = New information. <br />Normal = No change from last report. <br /> <br />1. Pheasant Manh2Dd Addition (private) (00061'-02126-0). Miscellaneous punch list items <br />remain- sidewalk cracks, dead trees, sod, brushpiles. City Public Works personnel addressing <br />these items. <br /> <br />2. 500,000 Gallon Elevated Water Tower (000616-03130-0). Cathodic Protection appears to <br />be working.. 'Drain valve has been repaired No further warranty items are apparent at this <br />time. <br /> <br />3. Hunten Crossing 2nd Addition (private) (000616-03132-0). Northdale's Construction <br />Estimator will go out to the field Monday, June 12, 2006 to view the project site to see if it is <br />cost worthy for them to dig up the curb stops, or to forgo the rest of their retainage on the <br />project. <br /> <br />4. Pheasant Manh 3rd Addition (private) (000616-03134-0). The contractor plans on starting <br />utility installation Monday, June 12, 2006 with two crews. Grading is complete. <br /> <br />S. Hunten Crossing 3rd Addition (private) (000616-05141-0). Contractor has completed all <br />water main, sanitary sewer, and storm sewer installation. They will now begin working on the <br />road section. <br /> <br />6. Industrial Park Improvements - Backage Road (000616-0~143-0). On tonight's agenda <br />will be a resolution to award the project contingent upon the outcome of the Public Purpose <br />hearing on the 16th. Contracts have been sent to the contractor for signatures. A <br />Preconstruction Meeting is scheduled for June 20, 2006,. at 10:30AM, at City Hall. In <br />summary, we are making sure everything is in place to be able to start immediately following <br />the hearing. <br /> <br />7. CSAH 14 (000616-06144-0). <br /> <br />Forcemain <br />We have draft drawings for the replacement of the existing forcemain under Main Street. The <br />for~emain will be replaced in conjunction with the CSAH 14 project by open cut methods as <br />decided by the Council at their last meeting. Once the county gives comments on the downtown <br />streetscape improvements, wefinalize these plans and submit them to the County. <br /> <br />Water Main <br />We. have draft drawings for the. extension of water main through the two blocks of downtown <br />along Main Street with stubs for future mains to the south as planned along the back side of <br />future redevelopment buildings. Once the county gives comments on the downtown streetscape <br />improvements, wefinalize these plans and-submit them to the County. .' --- - .... <br />