My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-06-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-06-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2006 3:08:00 PM
Creation date
6/12/2006 7:51:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PIII.ninl a ZoDiag Com-is.. Report ..d Reeo_eadatioD. <br /> <br />The P."itt8 " Zoains Commission met Oft June 6, 2006. tQ bold a publie J.rina to <br />coDSider a request of Anob County for a conditional use permit (CUP) to excavate and <br />fill in the t100cIway for the purpose of reJoeatjoa a portion orCIearwater Creek. <br /> <br />Findings: <br /> <br />- 1) The applicant provided evidence that the CUP would be needed to avoid a hardship <br />and practical cIifticulty. <br /> <br />2) The applicant Provided evidence that public safety would be compromised if the <br />variance were DOt :arantedt specifically that the proposed safety improvements to <br />County State Aid Highway 14 could not be constructed without the proposed CUP. <br /> <br />3) The Commission determiDecl that no permanent adverse impacts to adioinina <br />properties would be caused by granting the CUP. <br /> <br />FINDINGS AND RECOMMENDATION: <br /> <br />The Planning & Zoning Commission recommends that the Conditional Use Permit be <br />aramect, fincIiDa specifically that the applicant bas lltisfied the necessary criteria to <br />qualify; however, subject to the foUowing conditions: <br /> <br />1) The project may be constructed in accorda1lce with the plans and specifications <br />sub~ with the application provided Grantee's engineer submits a certificate <br />indicatiDs that tho ~ water velocity, duratiOD, rate of rise. base flood <br />elevation and sediment transport for the completed segment of the creek will not <br />exceed that of the portion of CIeatwater Creek that the project replaces. <br />2) Grantee will follow the standards and requirements of the City of Centerville, <br />1Uce Creek Watershed District, Army Corp or BftJineers, FBMA. Minnesota <br />DNa and any other agency having jurisdiction over the project or the waters of <br />Clearwater Creek. <br />3) At the completion of the project grantee's engineer sha1l submit a certificate that <br />the project -.I was completed in conformange with'the plan tiled with <br />the appticatiOD. <br />4) Grantee will ~e a Letter of Map Revision (LOMa) 80m Federal Emergency <br />~ Aseaoy subsequent to the completion of the project, but not later <br />than 12 ttlontbs foUowinS completion. . <br /> <br />Approved on June 6, 2006 <br /> <br />Dallas Latson, Administrator <br /> <br />If <br />
The URL can be used to link to this page
Your browser does not support the video tag.