My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-06-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-06-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2006 3:08:00 PM
Creation date
6/12/2006 7:51:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT COSTS <br />Detailed cost estimates of the proposed utilities and street improvements to serve Hanzal <br />Development and properties on the east side of Old Mill Road are included in Appendix A. Unit <br />prices are estimated and based on recent, similar type projects in the north metro area of the Twin <br />Cities.. The Total Project Cost is $325,963..37, which includes 5% contingencies, and 30% indirect <br />costs. Indirect costs include administrative, engineering, interest, and legal expenses.. A summary of <br />the estimated total project costs is as follows: <br /> <br />Sanitary Sewer <br />Water Main <br />Services <br />Storm Sewer <br />Streets <br />TOTAL <br /> <br />$59,145.45 <br />40,690.65 <br />13,697.78 <br />87,0] 8.. 7S <br />125,410.74 <br />5325,963.37 <br /> <br />PROJECT SCHEDULE <br />City Council Order Feasibility Study <br />Present Feasibility Report & Order Public Hearing <br />Public Hearing, Council Order Plans/Specs <br />Submit Plans for Council Approval, Order Advertisement <br />Open Bids, Award Contract <br />Construction <br />Assessment Hearing <br /> <br />Marcht 2006 <br />May 24, 2006 <br />June 14, 2006 <br />July 26, 2006 <br />August, 2006 <br />August - October <br />November, 2006 <br /> <br />CONCLUSIONS AND RECOMMENDATIONS <br />This project is feasible from an engineering standpoint and is in accordance with the City's <br />Comprehensive plan.. The following recommendations are presented for the Council's consideration: <br /> <br />I. This report be adopted as a guide for improvements to Hanzal Development Project. <br />2.. Proposed assessments should be reviewed by City Staff. <br />3. A Public Hearing should be scheduled to receive public input regarding the -proposed <br />improvement. <br /> <br />H""ter.! Cross;", 3,.d Addilion <br /> <br />6 <br /> <br />==c=~---_-~.. . .. .__. <br /> <br />---- c.e T <br />
The URL can be used to link to this page
Your browser does not support the video tag.