Laserfiche WebLink
<br />EASEMENTS <br />All utility and street work will take place within the 66-foot wide road right-of-way or on the Hanzal <br />property. <br /> <br />FUNDING/ASSESSMENTS <br />Assessments are proposed to be levied against the benefited properties along Old Mill Road. A <br />preliminary assessment roll has been prepared by City Staff. Estimated assessments could be revi~d <br />based on project costs once the work is complete. City Staff will al$o provide guidance on the" <br />assessment methodology.. <br /> <br />Additional costs for larger pipe (8" VS.. 6") should be funded through the City's trunk water main <br />fund. <br /> <br />Item Qtt Unit Unit Price Total Price <br />8" vs. 6" water main 760 LF $3.00 $2,280 <br />8" vs.. 6" gate valve 2 EA $2S'O~OO $500 <br />8" VS.. 6" fittings 300 LB $1.50 $450 <br />8" VS.. 6" joint restraint 13 EA $15.00 $200 <br /> Subtotal $3,430 <br /> 5% Contingency $180 <br /> Total Construction $3,610 <br /> 30% Indirect Costs S 1.090 <br /> Total Trunk Water Main $4,700 <br /> <br />11,,"181.5 Cross;", 3,.d I'ddilio" <br /> <br />5 <br /> <br />~3 <br />