My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-13 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2019
>
2019-03-13 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2019 9:17:28 AM
Creation date
3/12/2019 9:12:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT APPROACH 3 <br /> Project <br /> Understanding� �� �ww� ��� <br /> ����& ����� � �������U�����������n <br /> The City ofCenterville inlooking tofreshen up For this project vvopnoponoathroo-stoppr000nnto <br /> their image through amultiple pronged city wide meet your rebranding and renovation needs. <br /> approach. One ���@8�&� �^ ��@8�� �� - ����^U^�� ���&�����&��� <br /> renovating City Hall vvith respect to improving public <br /> Phase ^^ Part Facility"""~� ^�� ~ <br /> perception ofCenterville anagreat place tolive and Preliminary Assessments and Report Review <br /> do business. Another outcome ofthis effort into <br /> improve accessibility and efficiencies between the Tobuild astrong foundation,atthe project initiation' <br /> Fire Station and City Hall.The preliminary budget for a detailed review ofany previous studies will be <br /> the renovations in$300'000and may include: performed.This review will focus onunderstanding <br /> thofaoi|ityde�oionoionnotod' ifan� <br /> ^ <br /> Exterior onhanoonnontnofthe pedestrian <br /> approach to City Hall, Existing Building Document Review <br /> ^ <br /> Integration of historical artifacts celebrating Su000nnfu| planning efforts begin with afu|| <br /> Contorvi||e'nhintory, understanding and accurate depiction ofthe existing <br /> faoi|it� Our toannvvi|| roviovvand update the existing <br /> ^ providing internal a000nntotho Fire Station' drawings, if required,to match the current conditions. <br /> ^ <br /> Improving accessibility and safety atthe City Hall This incritical for the foundation moving forward to <br /> oonfirnnand create accurate infornnation <br /> ho|pdonkandinthoCounoi| Channborn' <br /> ^ <br /> Enhancing the appeal ofthe council chambers Building Audit <br /> for both inperson attendees anwell antelevision Although not intended toboexhaustive,the audit <br /> viewers, will focus onidentifying general building conditions, <br /> ^ <br /> Improving flow and safety for visitors attending operational,and security considerations,which may <br /> meetings with city staff, inform the development ofany planning concepts. <br /> This information also supports the future review <br /> ^ <br /> Improving restroom accessibility,and ofadvantages and disadvantages ofexpansion/ <br /> r�novationoptionn� LEOADALYvvi|| notprovid� <br /> ^ Improving audio separation fronnthe City Hall help nnoohanioa|'o|ootrioaiorp|unnbing evaluations <br /> donkfronnthorontofoityha|| ntaff� anthis will boconducted byanother firm. VVowill, <br /> Introduction however,work with any MEP information provided to <br /> integrate the best solution for the City. <br /> The planning and re-branding effort begins with a <br /> oonnp|otounderstanding ofthe current and future <br /> Operational Evaluation <br /> needs ofthe city anwell ananunderstanding ofthe |tincritical tounderstand the amount ofpeople <br /> limitations and conditions ofthe existing facility. who move through the building,the times ofdays <br /> The LEO ADALyteam has developed many planning ordays ofweek, hours ofoperation,and general <br /> option efforts for local municipalities.Through persona ofvisitors and staff which can assist in <br /> these experiences,vvounderstand that amunicipal <br /> study must becomprehensive tosupport the <br /> decision ofthe community leaders but streamlined <br /> tobeacost-effective and part ofarapid planning <br /> process.Tocomplement our team,vveintegrate RJIVI <br /> Construction,for cost estimation and construction <br /> feasibility bringing their local knowledge ofthe <br /> bidding and construction market. Our experiences <br /> have provided asolid foundation ofatried and true <br /> methodology for effective planning efforts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.