My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-21 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2019
>
2019-05-21 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 11:38:49 AM
Creation date
5/17/2019 11:37:44 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
May 21, 2019 <br /> Centerville Planning and Zoning Commission <br /> Page 3 of 6 <br /> Midwest Best Water-Conditional Use Permit <br /> Green Space and Landscaping0)))) 1yI'�11i11aiilllilllfl i� U111��JJJ1 �1f�lffff�� ,; <br /> • Industrial uses are required by code to <br /> have a minimum of 10%of the lot area in <br /> green space. The site plan (top right) shows INh A <br /> about 14,000 square feet, or 14%, of the 1 <br /> U <br /> 1 x { G <br /> 101 000 s -ft site as green space, so the <br /> q g p <br /> project meets this standard. Z <br /> • Industrial parking lots are required by code �,�� ��r � �''�%�„y {,F�ya � <br /> to have 3 percent within the parking area <br /> "landscaped with grass and shrubbery and L o <br /> other approved ground cover." The site <br /> plan provides this, with over 6%of the 20`'ATTA7T <br /> parking lot in green space (green areas <br /> within blue dashed area, middle right). <br /> • Industrial uses are required by code to <br /> landscape the lot, including: ��� <br /> w <br /> o One overstory tree for every 3,000 U <br /> square feet of site area, including 1 " <br /> tree for every 50 feet of boulevard. n <br /> {u <br /> The site is 101,000 square feet in X 0 <br /> area with 630 feet of street " <br /> frontage. This requirement translates (1 <br /> to 34 overstory trees, of which 13 " <br /> w <br /> would be boulevard trees; and <br /> z0"AiTHEE <br /> o One foundation planting for every 11 <br /> /"' ,vr� Pam^� /'"'/f�'��I� P �°� �� 1� <br /> 10 lineal feet of building and x to <br /> perimeter of parking area. Move some <br /> overstory trees V <br /> ( to boulevard <br /> 1,14 <br /> • The landscape plan submitted (bottom r <br /> right) has the required foundation , = <br /> plantings and trees, but there are not <br /> enough trees actually on the boulevard <br /> as required. This can be remedied as <br /> illustrated, makingsure there is ade uate <br /> q <br /> space, about 10', between the parking lot <br /> edge and the lot line for the trees, Fl{ i�"Aiiniii lf.j w<;111 s w <br /> especially on the west side where there is "'j <br /> waft <br /> a section of retaining wall. This may % <br /> require slight adjustment of the site plan. 50 r,pax S11Dr1CJ1FI(.101r <br /> 20�`AVE\`GE <br /> 1 1g v'1I I ir ri inrt <br />
The URL can be used to link to this page
Your browser does not support the video tag.