My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-22 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2019
>
2019-05-22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2019 11:01:40 AM
Creation date
5/20/2019 7:46:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that have been prepared by a competent registered professional civil engineer to the City for <br /> approval by the City Council. The Developer shall obtain all necessary permits from other <br /> agencies before proceeding with construction of the Improvements. The Developer, at its sole <br /> expense, shall instruct its engineer to provide adequate field inspection personnel to assure an <br /> acceptable level of quality control to the extent that the Developer's engineer will be able to <br /> certify, as a condition of City acceptance, that the construction work for the Improvements meet <br /> the approved City standards. <br /> The Developer, its contractors and subcontractors, shall follow all instructions received <br /> from the City and Rice Creek Watershed inspectors, so long as consistent with the Plans. The <br /> Developer's engineer shall provide for on-site project management. The Developer or its <br /> engineer shall schedule a pre-construction meeting at a mutually agreeable time and location <br /> with all parties concerned, including the City Engineer, inspector and/or consultants, to review <br /> the program for the construction work. Prior to the pre-construction meeting, Developer shall <br /> supply a schedule of construction activities and shall amend the schedule from time to time as <br /> necessary. Before the Security for the completion of Public Improvements is released in total, <br /> iron monuments must be installed in accordance with Minn. Stat. Chapter 505. The Developer's <br /> surveyor shall submit a written notice to the City certifying that the monuments have been <br /> installed. <br /> 8. PERMITS. The Developer shall obtain, or require its contractors and <br /> subcontractors to obtain, all necessary permits. Those permits obtained by Developer to begin <br /> work include, but are not limited to: <br /> A. Minnesota Pollution Control Agency — National Pollutant Discharge Elimination <br /> System Permit For Storm Water Discharge Related To Construction Activity <br /> B. Rice Creek Watershed District—General Permit For Development Activity <br /> C. City of Centerville- Building Permit for home construction <br /> VERSION FOR COUNCIL 05/22/2019 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.