My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2019
>
2019-08-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 7:20:26 AM
Creation date
8/12/2019 7:20:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEASIBILITY STUDY <br />7.0PATHWAY AND SIDEWALK IMPROVEMENTS <br />No additional pedestrian connections or segments are being proposed at this time. The existing <br />bituminous pathway along Sorel to the east of Centerville Road will be removed and replaced <br />with a 6-foot wide concrete sidewalk. This will better accommodate the proposed street section, <br />as well as be more consistent with potential future redevelopment. At this time, no impacts are <br />anticipated to the pathway along Centerville Road north of Main Street, or the pathway along <br />Sorel to the west of Centerville Road. If impacts to these facilities become necessary during <br />further design or construction, they will be replaced in kind. <br />With the proposed street and utility improvements, curb returns at intersections will need to be <br />reconstructed. Pedestrian facilities, including curb ramps, will be designed to conform to ADA <br />standards. <br /> City of Centerville <br /> 2020 Downtown Street and Utility Improvement Project <br />Project No.: 193804758 9 <br />29 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.