FEASIBILITY STUDY <br />7.0PATHWAY AND SIDEWALK IMPROVEMENTS <br />No additional pedestrian connections or segments are being proposed at this time. The existing <br />bituminous pathway along Sorel to the east of Centerville Road will be removed and replaced <br />with a 6-foot wide concrete sidewalk. This will better accommodate the proposed street section, <br />as well as be more consistent with potential future redevelopment. At this time, no impacts are <br />anticipated to the pathway along Centerville Road north of Main Street, or the pathway along <br />Sorel to the west of Centerville Road. If impacts to these facilities become necessary during <br />further design or construction, they will be replaced in kind. <br />With the proposed street and utility improvements, curb returns at intersections will need to be <br />reconstructed. Pedestrian facilities, including curb ramps, will be designed to conform to ADA <br />standards. <br /> City of Centerville <br /> 2020 Downtown Street and Utility Improvement Project <br />Project No.: 193804758 9 <br />29 <br /> <br />